| Packaging Details | Standard Export Packing |
| Delivery Time | To Be Negotiated |
| Payment Terms | T/T,L/C,Western Union |
| Supply Ability | To Be Negotiated |
| Name | Animal Incinerator |
| Primary chamber | Combustion chamber |
| Secondary chamber | High-temperature incineration |
| Flue gas treatment | Cold heat exchanger |
| Emission control | Dust collector |
| Discharge method | Chimney |
| Ash handling | Manual extraction |
| Place of Origin | Chongqing-China |
| Brand Name | Huanxiang |
| Certification | CE,ISO,KEMA,GOST |
| Model Number | Customized |
View Detail Information
Explore similar products
Fire resistant oil treatment device and fuel purification device for increasing
Zero Emission Technology for Clean Energy and Eco-Friendly Industrial Solutions
Advanced Oxidation Catalyst M with Large Specific Surface Area High Catalytic
Fully Enclosed Domestic Waste Incinerator with High Incineration Efficiency and
Product Specification
| Packaging Details | Standard Export Packing | Delivery Time | To Be Negotiated |
| Payment Terms | T/T,L/C,Western Union | Supply Ability | To Be Negotiated |
| Name | Animal Incinerator | Primary chamber | Combustion chamber |
| Secondary chamber | High-temperature incineration | Flue gas treatment | Cold heat exchanger |
| Emission control | Dust collector | Discharge method | Chimney |
| Ash handling | Manual extraction | Place of Origin | Chongqing-China |
| Brand Name | Huanxiang | Certification | CE,ISO,KEMA,GOST |
| Model Number | Customized | ||
| High Light | Harmless Animal Incinerator ,Animal Incinerator Customized ,Customized Pet Cremation Incinerator | ||
Our harmless incineration furnace for diseased animal carcasses follows a comprehensive process to ensure safe and efficient disposal:
Primary Combustion Phase: Material is fed into the primary combustion chamber and ignited by a temperature-controlled combustion system. Following the combustion principle of three T's (temperature, time, vortex), complete oxidation, pyrolysis, and burning occurs in this initial stage.
Secondary Combustion Phase: Smoke generated from primary combustion enters the secondary combustion chamber for high-temperature incineration, ensuring more complete combustion and destruction of harmful elements.
Emission Control Phase: The flue gas proceeds through a cold heat exchanger for cooling, then passes through a dust collector for purification before being safely discharged through the chimney, meeting all environmental standards.
Waste Management: Ash generated post-combustion is manually extracted, properly transferred, and buried according to regulatory requirements.
Company Details
Business Type:
Manufacturer
Year Established:
2017
Total Annual:
20000000usd-25000000usd
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&... Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&...
Get in touch with us
Leave a Message, we will call you back quickly!