China factories

Chat Now Send Email
China factory - Chongqing Huanxiang Industrial. Co., Ltd.

Chongqing Huanxiang Industrial. Co., Ltd.

  • China,Chongqing ,Chongqing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Multi Purpose Environmental Protection Equipment Automatic ignition Waste
China Multi Purpose Environmental Protection Equipment Automatic ignition Waste

  1. China Multi Purpose Environmental Protection Equipment Automatic ignition Waste
  2. China Multi Purpose Environmental Protection Equipment Automatic ignition Waste
  3. China Multi Purpose Environmental Protection Equipment Automatic ignition Waste
  4. China Multi Purpose Environmental Protection Equipment Automatic ignition Waste

Multi Purpose Environmental Protection Equipment Automatic ignition Waste

  1. MOQ: 1 Piece
  2. Price: To Be Negotiated
  3. Get Latest Price
Packaging Details Standard Export Packing
Delivery Time To Be Negotiated
Payment Terms T/T,L/C,Western Union
Supply Ability To Be Negotiated
Name Environmental Protection Equipment
Calorific value 2800Kcak/Kg
Furnace body type Vertical cylindrical
Processing capacity 30-500kg/h/time
Ignition method Automatic ignition
Furnace pressure -3--10mmH₂O column
Supply voltage 380V/50Hz
Place of Origin Chongqing-China
Brand Name Huanxiang
Certification CE,ISO,KEMA,GOST
Model Number Customized

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Packaging Details Standard Export Packing Delivery Time To Be Negotiated
Payment Terms T/T,L/C,Western Union Supply Ability To Be Negotiated
Name Environmental Protection Equipment Calorific value 2800Kcak/Kg
Furnace body type Vertical cylindrical Processing capacity 30-500kg/h/time
Ignition method Automatic ignition Furnace pressure -3--10mmH₂O column
Supply voltage 380V/50Hz Place of Origin Chongqing-China
Brand Name Huanxiang Certification CE,ISO,KEMA,GOST
Model Number Customized
High Light Multi Purpose Environmental Protection EquipmentAutomatic ignition Waste Incinerator MachineMulti Purpose Waste Incinerator Machine
Customized Multi-Purpose Garbage Incinerator With Negative Pressure Design, Automatic Ignition, And 30-500kg/H Processing Capacity
Product Overview
  • Suitable for: rural household waste, medical waste, pet animal carcasses, industrial waste, etc.
  • Calorific value of incineration: mixed calorific value approximately 2800 Kcal/Kg
  • Furnace body type: vertical cylindrical type
  • Equipment processing capacity: 30-500 kg/h per cycle
  • Ignition method: automatic ignition
  • Manual ash discharge and feeding
  • Auxiliary fuel: liquefied gas (low calorific value 10495 Kcal/Kg)
  • Furnace pressure: negative pressure design, no backfire, -3 to -10 mmH₂O column
Incineration Process for Household Waste
Equipment process diagram for household waste incineration treatment
System Composition

Shredder, screw conveyor, primary incineration room, secondary incineration room, water mist cooling and dust removal tower, cyclone dust removal tower, dry absorption filter tower, pulse bag filter.

Main Performance Specifications
Supply voltage 380V/50Hz
Total installed power <50 Kw
Processing capacity 4 T/d
Garbage reduction rate >95%
Water consumption <1 T/h
Fuel consumption Approximately 5-25 kg/h (varies according to waste calorific value)
Nitrolime consumption 6 Kg/h
Activated carbon consumption 2 Kg/h
Exhaust emissions Complies with GB18485-2001 "Pollution Control Standard for Municipal Solid Waste Incineration"
Noise Complies with Class I standard requirements of GB12348-90 "Industrial Enterprise Boundary Noise Standard"
Mean time between failures >3000 h
Garbage Incineration Treatment Process Flowchart
Process flowchart of garbage incineration treatment
Process Flow Description

Dry garbage enters the shredder from the feed hopper and is processed into fragments approximately 20mm in length, then sent by the screw feeder to the primary incineration chamber for incineration. The primary incineration chamber is combusted by the burner, with temperature controlled at 850-1000°C. After pyrolysis, drying, decomposition, coking and full combustion, the dry waste reduction rate reaches more than 95%, and the remaining ash is automatically discharged.

The high-temperature smoke generated by combustion enters the secondary combustion chamber and is burned again by the burner at temperatures above 1100°C. When the smoke is fully burned, the production of dioxins can be effectively avoided.

After secondary combustion, the flue gas enters the cyclone dust removal tower under the action of the induced draft fan. The dust-containing gas generates centrifugal force during rotation, throwing dust particles with density greater than the gas to the tower wall, removing approximately 75% of the flue gas.

The dust after initial dust removal enters the water mist cooling and dust removal tower, and is fully combined with ultra-fine water mist, quickly cooling the temperature to about 200°C. Through rapid cooling, residual dioxins in the flue gas are effectively eliminated and further dust is removed.

The flue gas then enters the dry absorption filter tower, where it is desulfurized and deacidified through the "spray reactor + activated carbon injection device", and harmful substances are adsorbed to remove odor. The dry dust is further filtered through the pulse bag filter, resulting in no peculiar smell and no foul odor. The smoke is discharged to the atmosphere through the chimney, meeting emission standards.

The remaining ash and dust collected during the treatment process are stored in bags, sealed and buried regularly to prevent soil pollution.

Project Examples
Incinerator project installation example 1 Incinerator project installation example 2 Incinerator project installation example 3 Incinerator project installation example 4 Incinerator project installation example 5

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer

  • Year Established:

    2017

  • Total Annual:

    20000000usd-25000000usd

  • Employee Number:

    50~100

  • Ecer Certification:

    Verified Supplier

Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&... Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&...

+ Read More

Get in touch with us

  • Reach Us
  • Chongqing Huanxiang Industrial. Co., Ltd.
  • Floor 3,No.228,Liang Gang Avenue of Hui Xing Street,Yubei District,Chongqing of China 401120
  • https://www.powerplant-equipment.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement