| Packaging Details | Standard Export Packing |
| Delivery Time | To Be Negotiated |
| Payment Terms | T/T,L/C,Western Union |
| Supply Ability | To Be Negotiated |
| Name | Medical Waste Incinerator |
| Capacity | 1-20 Tons |
| Primary combustion chamber | Included |
| Secondary combustion chamber | Included |
| Flue gas temperature | 1200-1400°C |
| Cooling system | Water-cooled circulation |
| Final flue gas temperature | Below 300°C |
| Place of Origin | Chongqing-China |
| Brand Name | Huanxiang |
| Certification | CE,ISO,KEMA,GOST |
| Model Number | Customized |
View Detail Information
Explore similar products
Fire resistant oil treatment device and fuel purification device for increasing
Zero Emission Technology for Clean Energy and Eco-Friendly Industrial Solutions
Advanced Oxidation Catalyst M with Large Specific Surface Area High Catalytic
Fully Enclosed Domestic Waste Incinerator with High Incineration Efficiency and
Product Specification
| Packaging Details | Standard Export Packing | Delivery Time | To Be Negotiated |
| Payment Terms | T/T,L/C,Western Union | Supply Ability | To Be Negotiated |
| Name | Medical Waste Incinerator | Capacity | 1-20 Tons |
| Primary combustion chamber | Included | Secondary combustion chamber | Included |
| Flue gas temperature | 1200-1400°C | Cooling system | Water-cooled circulation |
| Final flue gas temperature | Below 300°C | Place of Origin | Chongqing-China |
| Brand Name | Huanxiang | Certification | CE,ISO,KEMA,GOST |
| Model Number | Customized | ||
| High Light | 1 Tons Medical Waste Incinerator ,20 Tons Medical Waste Incinerator ,Direct Fired Hospital Waste Incinerator | ||
Complete incineration system including:
The waste is fed into the main furnace body where it undergoes complete combustion under high temperature and vortex jets. Following the 3T principle (temperature, time, vortex), the waste is fully gasified, oxidized, pyrolyzed, and burned in a single process.
The high-temperature exhaust gas enters the secondary combustion chamber and dust collector, where it undergoes further combustion at 1200-1400°C to ensure complete destruction of contaminants. The main furnace body utilizes a water-cooled circulation system to maintain flue gas temperature below 1000°C.
Flue gas then proceeds through the cyclone dust removal system using dry absorption methods to remove heavy metals and small particles. After cyclone dust removal, the gas enters a water curtain spray cooling system to reduce temperature below 300°C.
Finally, the flue gas passes through the bag dust removal system to remove fine dust particles. The up-to-standard gas is introduced into the chimney via the exhaust system and safely discharged into the atmosphere. The resulting ash is removed by the ash removal device, screened, and transferred to landfill.
Company Details
Business Type:
Manufacturer
Year Established:
2017
Total Annual:
20000000usd-25000000usd
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&... Founded in 2017, Chongqing Huanxiang Industrial Co., Ltd. is located in Cuntan Bonded Port Area of Chongqing, an advantageous region in the upper reaches of the Yangtze River with convenient transportation. Since its establishment, the company has adhered to a development model of integrated R&...
Get in touch with us
Leave a Message, we will call you back quickly!