Products
Manufacturer of a wide range of products which include 11tons/h Steam generation Preheating Rotary Kiln Large Capacity Energy Saving,Hazardous Waste Treatment Rotary Calcination Furnace Stable Operation Environmen,Vertical Structu...
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Processing extent | Solid waste, Sludge, Waste liquids |
| Processing capacity | 30000tons/year |
| Steam generation | 11tons/h |
| Steam generation temperature | 435°C |
| Area | 33*108㎡ |
| Pollution Source | Hazardous Waste |
| Delivery Time | 2-6months |
| Warranty | 1 year |
| HS Code | 8417809090 |
| Brand Name | RUIDING |
| Model Number | Rotary kiln |
| Certification | ASME/GB/ISO/EAC (EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Solution | Rotary Kiln |
| Pollution Source | Hazardous Waste |
| Capacity | 35000t/a |
| Operation mode | 24-hour operation |
| Advantages | Long service life |
| Operating cost | Low |
| Delivery Time | 2-6months |
| Warranty | 1 year |
| HS Code | 8417809090 |
| Brand Name | RUIDING |
| Model Number | Rotary kiln |
| Certification | ASME/GB/ISO/EAC (EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Boiler Model | QC37/1280-20-4.6/400 |
| Flow Rate | 37000 Nm³/h |
| Inlet Temp | 1280°C |
| Evaporation | 20 t/h |
| Steam Pressure | 4.6 MPa |
| Steam Temp | 400℃ |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Flue gas volume | 18000Nm³/h |
| Flue gas temperature | 1200℃ |
| Evaporation | 14.4t/h |
| Steam pressure | 1.2MPa(g) |
| Steam temperature | 220(210~235)℃ |
| Feed water temperature | 137℃ |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Boiler Model | QC37/1280-20-4.6/400 |
| Flow Rate | 35000 Nm³/h |
| Inlet Temp | 1200°C |
| Evaporation | 22 t/h |
| Thermal Efficiency | 83.5% |
| Layout | Open-air Installation |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Steam quality compliance rate | > 99% |
| Quick-release interface | box-type economizer flange seal + slide rail positioning |
| Steam pressure | 4.6MPa |
| Superheated steam temperature | 400℃ |
| Temperature fluctuation | ≤±5℃ |
| Occupancy optimization | 50% |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Smoke duct adjustment technology | variable cross-section electric damper + pressure feedback |
| Adjustment range | 60%-120% |
| Feed water temperature | 104℃ to 180℃ |
| Anti-freeze design | open-air layout, integrated electric heating + insulation layer |
| Winter thermal efficiency loss | <3% |
| Operating temperature range | adapt to extreme environments from -30℃ to 50℃ |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Inlet flue gas volume | 15600Nm³/h |
| Inlet flue gas temperature | 1150℃ |
| Boiler calculated evaporation volume | 14t/h |
| Boiler rated steam temperature | 210~235℃ |
| Boiler feed water temperature | 130℃ |
| Waste heat recovery efficiency | 83% |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Equipment life | >15 years |
| Anti-low temperature dew point corrosion | five channel three stage enamel economizer |
| Exhaust conditions | 200℃ |
| Quick cooling and ammonia spray cooling | 950℃ down to below 600℃ |
| Waste heat recovery efficiency | 84.7% |
| Equipment life extension | 50% |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
MOQ: 1
Price: Negotiable
| Payment Terms | L/C,T/T |
| Ultra-high temperature resistance | 1500℃ flue gas |
| Life extension | 40% |
| Exhaust temperature optimization | 15% |
| Rated thermal efficiency | 84% |
| Flue gas temperature gradient | 1280℃ to 200℃ |
| Annual heat transfer efficiency attenuation rate | <2% |
| delivery time | 2-6months |
| Warranty | 1 year |
| HS Code | 8402190000 |
| Brand Name | RUIDING |
| Model Number | Special boiler |
| Certification | ASME/GB/ISO/EAC(EAEU) |
| Place of Origin | China |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!