| Packaging Details | Carton |
| Delivery Time | 2-3 Weeks |
| Payment Terms | T/T |
| Engine | Diesel/Electric |
| Drilling Pipe Dia | 50 mm |
| Feature | High Efficiency |
| Drilling Diameter | Up to 1000 mm |
| Weight | Up to 10 tons |
| Colour | YELLOW |
| Control System | Hydraulic |
| Drill Weight | 975kg |
| Type | Hydraulic |
| Max Drilling Dia | 2.8m |
| Rig Weight | 1300KG |
| Power Source | Hydraulic |
| Spec Drill Pipe | Ф377*22*3000 mm |
| Drilling Tool | φ559*22-φ351*14 double wall drill pipe |
| Drill Rod Caliber | 50mm /42mmmm |
| Place of Origin | China |
| Brand Name | Xianfeng |
View Detail Information
Explore similar products
Hydropower Projects Hydraulic Drilling Rig For Crawler 45mm-102mm XUB135
XUD125 Jumbo Hydraulic Drilling Rig Machine Dual Boom For Underground Mining
XCMG XTD3130 Hydraulic Drilling Rig Underground Jumbo Heavy Duty Three Arm
KJ321 Hydraulic Tunneling Jumbo Mine Machine Drilling Rig For Underground
Product Specification
| Packaging Details | Carton | Delivery Time | 2-3 Weeks |
| Payment Terms | T/T | Engine | Diesel/Electric |
| Drilling Pipe Dia | 50 mm | Feature | High Efficiency |
| Drilling Diameter | Up to 1000 mm | Weight | Up to 10 tons |
| Colour | YELLOW | Control System | Hydraulic |
| Drill Weight | 975kg | Type | Hydraulic |
| Max Drilling Dia | 2.8m | Rig Weight | 1300KG |
| Power Source | Hydraulic | Spec Drill Pipe | Ф377*22*3000 mm |
| Drilling Tool | φ559*22-φ351*14 double wall drill pipe | Drill Rod Caliber | 50mm /42mmmm |
| Place of Origin | China | Brand Name | Xianfeng |
| High Light | Jumbo drilling rig hydraulic system ,Tunneling drilling rig hydraulic system ,Jumbo hydraulic boring rig | ||
The XUB125 hydraulic drilling jumbo is a high-efficiency drilling rig designed for tunneling, underground mining, and large-scale construction projects. Featuring powerful hydraulic controls, precise drilling capability, and excellent maneuverability, it is suitable for medium to large tunnel sections and offers outstanding performance in harsh working environments.
Dual-boom design for simultaneous drilling operations
Powerful hydraulic rock drills for fast penetration rates
Ergonomic operator cabin for improved comfort and safety
Flexible boom positioning for optimal drilling coverage
Low maintenance and long service life
| Parameter | Value |
|---|---|
| Number of Booms | 2 |
| Drilling Diameter | 45 – 102 mm |
| Drilling Depth | Up to 5 m per hole |
| Power Source | Diesel engine + electric |
| Rock Drill Power | 18 – 25 kW |
| Gradeability | 14° – 18° |
| Overall Dimensions | ~12,000 × 2,500 × 3,500 mm |
Tunneling in road, railway, and hydropower projects
Underground mining development and production drilling
Large-scale civil construction works
High drilling efficiency with accurate hole positioning
Strong adaptability to different geological conditions
Reliable hydraulic system for continuous operation
Reduced operating cost with durable components
Company Details
Business Type:
Manufacturer
Year Established:
2020
Total Annual:
5000000-10000000
Employee Number:
50~100
Ecer Certification:
Verified Supplier
/* Unique root container for style encapsulation */ .gtr-container-a1b2c3d4 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; box-sizing: border-box; max-width: 100%; ... /* Unique root container for style encapsulation */ .gtr-container-a1b2c3d4 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 20px; box-sizing: border-box; max-width: 100%; ...
Get in touch with us
Leave a Message, we will call you back quickly!