| Standard | GB,ASTM,AISI,BS,JIS |
| Type | Light,Heavy,Structural Steel Warehouse,Light Steel Frame Struture,prefabricated |
| Purlin | C/Z Galvanized Steel(Q235),Q235,C.Z Shape Steel Channel,C/Z section steel,C |
| Delivery Time | 45days |
| Packing | 40HQ or 40'OT,standard export package or as customer request |
| Supply Ability | 50000 tons per year |
| Size | According to Customer Requirement,Standard sizes,Customized,As customers' requirments,steel struture |
| Packaging Details | Custom Steel Pallets & Bundling |
| Grade | Q235 Q345B,steel,Q235B&Q345B,Q235 Q345 Low Carbon Steel,Hot Rolled Steel |
| Material | Steel Structure |
| Place of Origin | Binzhou, China |
| Certification | ISO9001:2015, ISO14001, ISO45001, TUV, EN1090 |
| Brand Name | SDKM |
View Detail Information
Explore similar products
Multi Level Prefabricated Steel Parking Structure Customized Steel Frame Car
Anti Rust Powder Coated Steel Parking Structures For Coastal Areas
Custom Design Multi Car Steel Parking Structures Garage Shed For Residential
Easy Assembly Steel Parking Canopy Galvanized For School And Hospital
Product Specification
| Standard | GB,ASTM,AISI,BS,JIS | Type | Light,Heavy,Structural Steel Warehouse,Light Steel Frame Struture,prefabricated |
| Purlin | C/Z Galvanized Steel(Q235),Q235,C.Z Shape Steel Channel,C/Z section steel,C | Delivery Time | 45days |
| Packing | 40HQ or 40'OT,standard export package or as customer request | Supply Ability | 50000 tons per year |
| Size | According to Customer Requirement,Standard sizes,Customized,As customers' requirments,steel struture | Packaging Details | Custom Steel Pallets & Bundling |
| Grade | Q235 Q345B,steel,Q235B&Q345B,Q235 Q345 Low Carbon Steel,Hot Rolled Steel | Material | Steel Structure |
| Place of Origin | Binzhou, China | Certification | ISO9001:2015, ISO14001, ISO45001, TUV, EN1090 |
| Brand Name | SDKM | ||
| High Light | galvanized metal parking structures ,galvanized metal covered parking structures ,heavy duty metal parking structures | ||
Heavy Duty Galvanized Steel Parking Structure with Solar Panel Mounting![]()
This innovative sustainable parking solution seamlessly integrates photovoltaic solar panels directly into a robust steel canopy structure, effectively transforming traditional parking spaces into clean, renewable energy generators. Carefully designed to support LEED certification and ambitious net-zero carbon goals, this system perfectly combines environmental responsibility with functional excellence. By maximizing renewable energy production, the integrated solar array can power EV charging stations, facility lighting, or even feed surplus electricity back into the grid. Simultaneously, the durable steel canopy provides premium shelter, protecting vehicles from harsh UV rays, heavy rain, and extreme weather conditions. This dual-purpose infrastructure not only significantly reduces the urban heat island effect but also lowers overall operational costs. Ultimately, this forward-thinking solution reimagines parking lots as active contributors to a greener future, delivering both ecological and economic value.
Key Features
| Component | Available Configuration |
| Primary frame | Fabricated H-section portal frame or long-span steel truss |
| Steel grade | Q355B, Q235B or approved equivalent |
| Secondary members | Galvanized C/Z purlins, wall girts, eave struts and bracing |
| Connections | High-strength and standard bolted connections |
| Design standards | GB, EN, AISC or AS/NZS requirements |
| Technical support | Erection documents, manuals and agreed project guidance |
![]()
![]()
![]()
FAQ
1.Can you provide customized design?
Yes, absolutely. We provide tailored engineering solutions and detailed construction drawings based on your specific site dimensions, intended usage, local climate conditions, load requirements, and budget constraints
2.What is the expected service life of the structure?
It depends on the surface treatment chosen. Structures with standard anti-corrosion paint typically last 25 years, while hot-dip galvanized structures can exceed 30 years. Regular maintenance can further significantly extend the lifespan.
3.Do you provide installation service?
Yes. We supply comprehensive installation guides in both Chinese and English, including detailed drawings, video tutorials, and technical manuals. Additionally, we can dispatch experienced engineers to the job site to provide on-site technical guidance and supervision if required.
4.What is the typical lead time for production?
Upon confirmation of the final drawings, the standard production cycle is approximately 20-35 days, depending on the project's scale and complexity. We always strive to meet your project schedule efficiently.
5.Do your products comply with international building codes?
We support design in accordance with GB, ASCE, EU, AS/NZS and other international standards. Structural calculation can be completed according to local wind load, snow load and seismic parameters to meet local code requirements.
6.Are English construction documents provided?
Yes, we provide a complete set of English documentation suitable for overseas construction and customs clearance. This includes structural drawings, packing lists, installation manuals, operation videos, and calculation reports.
Company Details
Business Type:
Manufacturer
Year Established:
2020
Total Annual:
100000000-120000000
Employee Number:
120~150
Ecer Certification:
Verified Supplier
.gtr-container-x7y2z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 16px; max-width: 100%; box-sizing: border-box; } .gtr-container-x7y2z1-title { font-size: 18px; font-weight: bold; color: #0C41... .gtr-container-x7y2z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; line-height: 1.6; padding: 16px; max-width: 100%; box-sizing: border-box; } .gtr-container-x7y2z1-title { font-size: 18px; font-weight: bold; color: #0C41...
Get in touch with us
Leave a Message, we will call you back quickly!