Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"Custom Fabricated AASHTO LRFD Steel Arch Bridge for Heavy-Duty Highway","imgUrl":"https:\/\/img.chinax.com\/nimg\/96\/12\/1e7911b3cdcd62338c04cd2bfab4-200x200-1\/custom_fabricated_aashto_lrfd_steel_arch_bridge_for_heavy_duty_highway.jpg","attrs":{"Color":"Painted or hot-dip galvanized","Model Number":"Steel Arch Bridges","Spanlength":"Typically ranges from 50 meters to over 500 meters","Designstandards":"Complies with international and local bridge design codes"}}
{"title":"AISI Q355 Steel Arch Girder Bridge Continuous Plate Weather Resistant","imgUrl":"https:\/\/img.chinax.com\/nimg\/c9\/d6\/b54dab08ae414f0180c177b160f8-200x200-1\/aisi_q355_steel_arch_girder_bridge_continuous_plate_weather_resistant.jpg","attrs":{"Brand Name":"FMS","Certification":"ISO 9001; ISO 14001; CE;","Place of Origin":"China","Minimum Order Quantity":"30mts"}}
{"title":"Large Span AASHTO LRFD Steel Arch Bridge for Urban Transport Engineering","imgUrl":"https:\/\/img.chinax.com\/nimg\/55\/b2\/3e8a18caf52268805ec2a7452f0d-200x200-1\/large_span_aashto_lrfd_steel_arch_bridge_for_urban_transport_engineering_projects.jpg","attrs":{"Weld Inspection":"100% UT on primary load-carrying welds","Payment Terms":"L\/C, D\/A, D\/P, T\/T","Welding Code":"AWS D1.5M Bridge Welding Code","Applications":"Urban transport infrastructure, long-span bridges"}}
{"title":"AASHTO LRFD Custom Curved Steel Arch Bridge for Long-Span River Crossing","imgUrl":"https:\/\/img.chinax.com\/nimg\/1c\/b0\/66461dbca7f48e7d1ef04c39ef5c-200x200-1\/aashto_lrfd_custom_curved_steel_arch_bridge_for_long_span_river_crossing_construction.jpg","attrs":{"Welding Standard":"AWS D1.5","Field Connection":"High-strength bolted or full-penetration groove welds","Price":"USD 1,000-1,500\/MT","Payment Terms":"L\/C, D\/A, D\/P, T\/T"}}
{"title":"Heavy Duty Steel Arch Bridges Ready-To-Install Prefab Welding","imgUrl":"https:\/\/img.chinax.com\/nimg\/84\/17\/a803b0c28eacad84b202947ab7e4-200x200-1\/heavy_duty_steel_arch_bridges_ready_to_install_prefab_welding.jpg","attrs":{"Brand Name":"FMS","Certification":"ISO 9001; ISO 14001; CE;","Place of Origin":"China","Minimum Order Quantity":"30mts"}}
{"title":"Bespoke Two Hinged Arch Bridges Three Hinged Galvanized","imgUrl":"https:\/\/img.chinax.com\/nimg\/5b\/b5\/437be9703c4abcbae963a44e59e7-200x200-1\/bespoke_two_hinged_arch_bridges_three_hinged_galvanized.jpg","attrs":{"Brand Name":"FMS","Certification":"ISO 9001; ISO 14001; CE;","Place of Origin":"China","Minimum Order Quantity":"30mts"}}
Typically ranges from 50 meters to over 500 meters
Designstandards
Complies with international and local bridge design codes
Payment Terms
L/C, D/A, D/P, T/T
Loadcapacity
Varies by design, typically up to several thousand tons
Loadtype
Supports vehicular, rail, pedestrian, and sometimes utility loads
Corrosionresistance
High, with protective coatings and treatments
Typicalapplications
Highways, railways, pedestrian crossings
Constructionmethod
Prefabrication and on-site assembly
Maintenancerequirements
Regular inspections, painting, and structural repairs
Supply Ability
5,000-15,000 MT/Year
Delivery Time
30-60 Days
Environmentalimpact
Low to moderate, depends on site and construction practices
Typicaluses
Roadways, railways, pedestrian crossings
Aestheticoptions
Customizable arch shapes and finishes
Packaging Details
Sea Freight (Container/Bulk Vessel)
Model Number
Steel Arch Bridges
Place of Origin
China
Certification
AISC IBR/ABR, AWS CWI, CE (EN 1090-1 FPC)
Brand Name
FASEC
The Custom Fabricated AASHTO LRFD Steel Arch Bridge is a heavy-duty, shop-built superstructure for North American and global projects adopting American engineering standards. Arch ribs function as main load-bearing members, transferring loads through compression to maximize steel performance. Designed to AASHTO LRFD and welded according to AWS D1.5M, every structure is fully customized. All closed-box arch ribs are prefabricated in ISO-certified workshops and pre-assembled before shipment to guarantee fitting accuracy and avoid on-site rework.
AASHTO LRFD Compliance – The U.S. Highway Standard
AASHTO LRFD is the mandatory design specification for U.S. federal highway bridges. Our design applies the Load and Resistance Factor Design method for comprehensive structural verification.
It adopts HL-93 live load as required by AASHTO. Steel component design follows Section 6 of AASHTO LRFD covering bending, shear, combined load effects and fatigue assessment. Seismic design follows relevant LRFD clauses. Engineers complete calculations for strength, service, fatigue and extreme event limit states to achieve a 75–100+ year design life with routine maintenance.
AWS D1.5M Welding Certification
All welding complies with AWS D1.5M/D1.5 Bridge Welding Code, the official standard for steel bridge fabrication jointly released by AWS and AASHTO. It imposes stricter welder qualification and inspection requirements than general structural welding standards.
Fracture-critical members require 100% ultrasonic testing for full penetration butt welds. All welders hold valid AWS certificates, and certified inspectors oversee production. Supplementary MT and PT testing will be implemented on related weld areas as needed.
Closed-Box Arch Section – Engineered for Strength
Arch ribs utilize closed-box sections with internal stiffeners, the preferred option for high-performance steel arch bridges.
This structure delivers outstanding torsional rigidity to withstand eccentric loads and skewed layouts. It boasts strong buckling resistance, ideal for unbraced arch designs. The favorable strength-to-weight ratio enables longer spans. Internal stiffeners prevent local buckling and optimize load distribution. Sealed inner surfaces reduce corrosion and maintenance costs, and the sleek shape fits landmark highway and river-crossing projects.
AASHTO LRFD seismic provisions, Category A through D
Welding Inspection
100% UT inspection on primary load-carrying welds
Fabrication Mode
Fully customized design, factory prefabrication and preassembly
Field Connection
High-strength bolted connection, no field welding
Anti-Corrosion Options
Hot-dip galvanizing (ASTM A123), weathering steel, epoxy paint systems
Optional Deck Type
Orthotropic steel deck / Composite concrete deck
Design Service Life
75 – 100+ years
Fabrication & Quality Assurance
All bridge modules are manufactured in ISO-certified facilities complying with AASHTO LRFD and AWS D1.5M.
Steel plates are sourced from qualified mills with complete Mill Test Reports (MTRs). Components are processed by CNC cutting and precision beveling. Main seams use submerged arc welding, while attachments adopt GMAW. All welders hold AWS certifications.
Critical full penetration welds receive 100% UT inspection; fillet welds are tested by MT on demand. Full preassembly is carried out before delivery to verify fitting. Surface blasting is conducted prior to anti-corrosion coating. Third-party inspection by SGS, Bureau Veritas or designated institutions is available. We provide a full technical dossier including design calculations, material certificates, WPS/PQR, NDT records and as-built drawings.
Conclusion – Custom Engineered, AASHTO Certified
The Custom Fabricated AASHTO LRFD Steel Arch Bridge integrates structural efficiency, heavy load capacity and fast construction for highway infrastructure projects. Designed and fabricated under recognized standards AASHTO LRFD and AWS D1.5M, this customized prefabricated solution supports HL-93 traffic loads and long-span requirements. Bolt-connected prefabricated segments shorten site work cycles. With proper maintenance, the bridge can operate reliably for 75–100+ years, and full technical documents are supplied for engineering approval.
Send your project parameters including span, width, site conditions and load requirements to our engineering team. We will offer AASHTO LRFD-compliant design and formal quotation within 48 hours. Engineered to AASHTO LRFD, welded to AWS D1.5M, custom-built for your infrastructure – your heavy-duty bridge solution starts here.
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...