Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
{"title":"Bespoke Two Hinged Arch Bridges Three Hinged Galvanized","imgUrl":"https:\/\/img.chinax.com\/nimg\/5b\/b5\/437be9703c4abcbae963a44e59e7-200x200-1\/bespoke_two_hinged_arch_bridges_three_hinged_galvanized.jpg","attrs":{"Brand Name":"FMS","Certification":"ISO 9001; ISO 14001; CE;","Place of Origin":"China","Minimum Order Quantity":"30mts"}}
Customizable with paint colors and architectural details
Environmental Resistance
Resistant to wind, seismic forces, and temperature variations
Supply Ability
5,000-15,000 MT/Year
Maintenance Requirements
Regular inspection and painting
Brand Name
FASEC
Certification
ISO 9001; EN 1090-1 FPC; CE; AWS CWI; AISC IBR/ABR
Place of Origin
China
Model Number
Steel Arch Bridges
The Prefabricated AASHTO LRFD Steel Arch Bridge is a high-performance, shop-fabricated structural system designed for highway and river crossing projects that demand long clear spans and fast on-site installation. The steel arch structure possesses excellent compressive performance and material efficiency, which is a cost-effective choice for projects where conventional girder bridges cannot meet span demands. Fabrication and design comply with AASHTO LRFD, and all welding work follows AWS D1.5M specifications. The whole bridge is divided into modular segments manufactured in factory, equipped with bolted field connections. This production mode greatly accelerates assembly progress, cuts on-site construction disturbance to traffic, and fully meets North American engineering compliance requirements.
AASHTO LRFD – The U.S. Highway Standard
Design adopts Load and Resistance Factor Design method, and all structural limit states are fully verified. The design live load adopts HL-93 standard including design truck load and lane load, which is the basic load requirement specified by AASHTO. Steel member design implements rules of AASHTO LRFD Section 6, covering flexure, shear force, combined load effect and fatigue performance check. Corresponding seismic design clauses from AASHTO LRFD are applied for seismic risk assessment. Engineers complete multiple load combination calculations covering strength limit state, service limit state, fatigue limit state and extreme event limit state to guarantee long-term structural safety.
Arch Configurations – Three Options
Arch Type
Description
Best For
Through Arch
Arch rises above deck; deck passes through
Limited vertical clearance; signature aesthetics
Tied Arch
Arch ribs connected by tension tie at deck level
Poor soil conditions – no horizontal thrust on abutments
AASHTO LRFD compliant, AWS D1.5M certified, ISO 9001
Prefabrication & Assembly
All structural components are completely manufactured inside the factory under stable production environments. Complete pre-assembly inspection will be conducted before delivery to verify assembly accuracy and avoid on-site modification work. The whole arch is split into independent modular segments, convenient for sea container or flatbed transportation and controlling logistics expenses. All joints adopt high-strength bolted connection schemes, eliminating field welding work and removing construction restrictions caused by bad weather. Project owners can carry out foundation construction simultaneously with bridge fabrication, realizing parallel operation. The overall on-site installation cycle can be shortened significantly to reduce traffic interruption time.
Quality Assurance
• Raw steel material is ASTM A709 Grade 50 certified, and complete Mill Test Reports (MTRs) will be supplied. All welders hold AWS qualification certificates, and welding follows fully qualified WPS/PQR in accordance with AWS D1.5M.
• Critical load-bearing welding seams receive 100% ultrasonic testing (UT), and MT or PT inspection will be arranged for related areas as required. Camber value is preset during production to counteract deflection induced by dead load. Surface treatment includes surface blasting and multi-layer epoxy coating or hot-dip galvanizing. We accept third-party inspection witnessed by SGS, Bureau Veritas or other organizations appointed by clients. A full set of technical documents including design calculation reports, material certificates, WPS/PQR, NDT records and as-built drawings will be sorted and delivered.
Conclusion – AASHTO Certified, Arch Strong
The Prefabricated AASHTO LRFD Steel Arch Bridge delivers proven structural performance, long-span capacity and rapid construction, designed in accordance with AASHTO LRFD and fabricated under AWS D1.5M. Suitable for river crossings, highway overpasses and transport infrastructure, this arch bridge features outstanding durability and less site disruption, fully complying with North American engineering requirements.
All modules are well protected for shipment with complete export documents available. We offer professional on-site assembly guidance, full technical files and reliable after-sales support.
Hangzhou FAMOUS Steel Engineering Co., Ltd. has over 20 years of experience manufacturing custom steel bridge components. Our certified factory meets international standards and serves global infrastructure projects worldwide.
Send your project parameters including span, width and clearance. We offer AASHTO-compliant design, arch selection and formal quotation within 48 hours. Engineered to standard, built to last.
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...
As the co-founder of FAMOUS Engineering Company, Mr.Tomy GAO has been in the construction field for many years, and established series of companies with the target to create ecological chain in the building construction industry.
Nowadays, under FASECBuildings Group, there are...