Products
Manufacturer of a wide range of products which include 3ft x 6ft 8in Snap-On Walk-Thru Scaffolding Frame with Galvanized Light Steel,Customizable Thickness Powder Coated H Frame Scaffolding with High Load Bearing,Heavy-Duty Scaffo...
MOQ: 100 PCS
Price: $5-15
| Payment Terms | T/T |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Main Structure | Galvanized Light Steel Frames |
| Earthquake Resistance | Strong |
| Drawing Design | by us |
| Application | Commercial, Industrial, Residential |
| Windresistance | Up to 60 m/s wind speed |
| Span | Customizable, typically 10-40 meters |
| Wall Cladding | Sanwich Panel, single sheet |
| Foundation | Concrete foundation |
| Structuralsystem | Load-bearing steel frame |
| Rooftype | Metal roofing |
| Warranty | 5 Years |
| Constructionspeed | Fast |
| Loadcapacity | Up to 500 kg/m² |
| Insulation | Optional thermal insulation |
| Design Load | Wind, Snow, Seismic |
| Brand Name | Shunyao Supply Chain |
| Place of Origin | Chengdu , China |
MOQ: 100 PCS
Price: $40-200
| Payment Terms | T/T |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Raw Steel Material | Q235B, Q355B, ASTM A36 |
| Product Insulation | Thermal and Sound Insulation |
| Cost | Moderate to High |
| Walltype | Steel panels |
| Shipment By | Container |
| Load Bearing Capacity | High |
| Life Span | 50-70 Years |
| Spancapability | Wide spans possible |
| Buildingheight | Customizable, typically 4-12 meters |
| Steel Frame | Welding Plates |
| Thermalinsulation | Moderate |
| Drawing Design | AUTOCAD, SOLIDWORKS, TEKLA |
| Usage | Commercial, Industrial, Residential |
| Material Grade | Q355B, Q235B |
| Production | Finished for direct install support |
| Brand Name | Chengdu , China |
| Place of Origin | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $5-12
| Payment Terms | T/T in advance |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Usage | For scaffolding and construction platforms |
| Productname | Scaffolding Castors |
| Temperaturerange | -20°C to 80°C |
| Material | Steel |
| Braketype | Total Lock Brake |
| Mountingtype | Plate Mount |
| Loadcapacity | 150kg per castor |
| Finish | Zinc Plated |
| Wheeltype | Swivel |
| Bearingtype | Ball Bearing |
| Noiselevel | Low noise polyurethane wheels |
| Height | 160mm |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $5-12
| Payment Terms | T/T in advance |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Bearing type | Ball Bearing |
| Usage | Scaffolding mobility |
| Material | Steel |
| Productname | Scaffolding Castors |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $5-12
| Payment Terms | T/T in advance |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Material | Steel |
| Bearingtype | Ball bearing |
| Finish | Zinc plated |
| Usage | For scaffolding mobility |
| Productname | Scaffolding Castors |
| Mountingtype | Plate mounted |
| Swiveltype | 360-degree swivel |
| Braketype | Total lock brake |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100 PCS
Price: $5-12
| Payment Terms | T/T in advance |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Productname | Scaffolding Castors |
| Braketype | Total lock brake |
| Material | Steel |
| Bearingtype | Ball bearing |
| Usage | For scaffolding and construction platforms |
| Finish | Zinc plated |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
MOQ: 100
Price: $5-12
| Payment Terms | T/T |
| Supply Ability | excellent |
| Delivery Time | 7-14 work days |
| Material | Steel |
| Productname | Scaffolding Castors |
| Mounting type | Plate |
| Wheeltype | Polyurethane |
| Color | Silver |
| Usage | For scaffolding mobility |
| Braketype | Total lock brake |
MOQ: 100 PCS
Price: $5-12
| Payment Terms | T/T in advance |
| Supply Ability | Excellent |
| Delivery Time | 5-15 days |
| Packaging Details | Bundles |
| Wheeltype | Polyurethane |
| Usage | For scaffolding mobility |
| Mountingtype | Plate |
| Material | Steel |
| Swivel | 360 degrees |
| Productname | Scaffolding Castors |
| Braketype | Total lock brake |
| Bearingtype | Ball bearing |
| Place of Origin | Chengdu , China |
| Brand Name | Shunyao Supply Chain |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!