
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Thickness | 13mm (10+3), 10-15mm Range |
| Base_Cure | 10 Hours |
| Application | Renovations, Tight Deadlines, Schools |
| Structure | Fast-Cure PU Elastic + EPDM Top |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Top_Layer | Virgin EPDM, 18-22% Rubber |
| Installation | 700-900 m²/Day, 8-Day Full |
| Ready_for_Use | 72 Hours After Completion |
| Impact_Absorption | 40-46% |
| Top_Coat_Cure | 12 Hours |
| Payment Terms | EXW |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Name | Rapid Installation Full PU Track |
| Model Number | Please refer to the model numbers in the product catalog |
| Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
| Place of Origin | Huizhou, Guangdong, China |
View Detail Information
Explore similar products
Ultimate Resilience PU Running Track Green Polyurethane Sports Surfaces
14mm 13mm University Running Track Abrasion Resistant Athletic Running Tracks
Eco Full PU Running Track System Low VOC Outdoor Running Track For LEED
All Weather Synthetic Jogging Track UV Resistant Synthetic Athletic Track
Product Specification
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation | Thickness | 13mm (10+3), 10-15mm Range |
| Base_Cure | 10 Hours | Application | Renovations, Tight Deadlines, Schools |
| Structure | Fast-Cure PU Elastic + EPDM Top | Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Top_Layer | Virgin EPDM, 18-22% Rubber | Installation | 700-900 m²/Day, 8-Day Full |
| Ready_for_Use | 72 Hours After Completion | Impact_Absorption | 40-46% |
| Top_Coat_Cure | 12 Hours | Payment Terms | EXW |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag | Name | Rapid Installation Full PU Track |
| Model Number | Please refer to the model numbers in the product catalog | Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | Place of Origin | Huizhou, Guangdong, China |
| High Light | 10mm running track flooring ,15mm running track flooring ,Purple Stadium Running Track | ||
Key Advantages: Fast‑cure PU binder system | Installation rate 700–900 m²/day | Usable in 72 hours after finish | No extended curing between layers | Ideal for last‑minute competition preparation
The Rapid Installation Full PU Track uses a specially formulated fast‑cure two‑component PU binder that significantly reduces curing time. The pure PU elastic layer cures in 10 hours (normally 24–36 hours), and the top coat cures in 12 hours (normally 48 hours). A full 13mm track can be installed by a 6‑person crew in 7–8 days, compared to 15–18 days for standard full PU systems. The track is ready for line marking and competition use within 72 hours of finishing the top coat.
Perfect for sports centres preparing for upcoming tournaments, school stadiums during short holiday breaks, and clubs needing rapid facility upgrades.
| Parameter | Value |
|---|---|
| Minimum base cure | Old asphalt: immediate; new concrete: 10 days |
| Installation rate | 700–900 m²/day (6 workers) |
| Base elastic layer cure | 10 hours |
| Top coat cure | 12 hours |
| Time to competition use | 72 hours after top coat |
| Total thickness | 13mm (10+3) – can be 10–15mm |
| Impact absorption | 40–46% (within standard) |
All other mechanical properties meet World Athletics competition standards.
| Step | Standard Full PU | Rapid Full PU |
|---|---|---|
| Base prep | 1–2 days | 0.5 day (wash only) |
| Base layer pour & cure | 2 days (pour + 24h cure) | 1.5 days (pour + 10h cure) |
| Top coat & scatter | 1.5 days (pour + 48h cure) | 1.5 days (pour + 12h cure) |
| Total | 15–18 days | 7–8 days |
Sports centres preparing for competition season
School stadiums during short summer/winter breaks
University track renovations between semesters
Clubs needing rapid facility upgrade
| Country | Project | Area | Install time | Year |
|---|---|---|---|---|
| Thailand | International school stadium | 3,800 m² | 8 days | 2024 |
| Mexico | Sports club main track | 4,500 m² | 7.5 days | 2025 |
| Turkey | University competition track | 3,200 m² | 7 days | 2024 |
No MOQ. Fast‑cure binder shelf life: 2 months – order when ready to install. Lead time 15 days.
Q: Does fast cure reduce elasticity or lifespan?
→ No. Final mechanical properties meet World Athletics standards. Lifespan remains 12+ years.
Q: Can it be installed in cold weather?
→ Minimum application temperature is 10°C. For colder climates, we supply a cold‑cure additive.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...
Get in touch with us
Leave a Message, we will call you back quickly!