
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Installation | 5-7 Day Full Installation |
| Application | Renovations, Tight Deadlines, Schools |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Payment Terms | EXW |
| Impact_Absorption | 35-45% |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Drainage | Permeable, Fast Draining |
| Features | Fast Cure, Quick Drainage, Minimal Downtime |
| Structure | Quick-Cure PU + EPDM Top |
| Thickness | 13mm |
| Type | Fast-Lay Permeable PU Track |
| Name | Permeable Running Track |
| Service_Life | 8-10 Years |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
| Place of Origin | Huizhou, Guangdong, China |
| Model Number | Please refer to the model numbers in the product catalog |
| Brand Name | lida&lvhuan |
View Detail Information
Explore similar products
13mm Permeable Running Track All Weather Synthetic Rubber Track Breathable
Eco Friendly Polyurethane Running Track Recycled Rubber Athletic Track
Abrasion Resistant Permeable Running Track Porous PU Running Track Durable Low
UV Resistant All Weather Running Track Fast Drainage EPDM Track 13mm
Product Specification
| Installation | 5-7 Day Full Installation | Application | Renovations, Tight Deadlines, Schools |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. | Payment Terms | EXW |
| Impact_Absorption | 35-45% | Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Drainage | Permeable, Fast Draining | Features | Fast Cure, Quick Drainage, Minimal Downtime |
| Structure | Quick-Cure PU + EPDM Top | Thickness | 13mm |
| Type | Fast-Lay Permeable PU Track | Name | Permeable Running Track |
| Service_Life | 8-10 Years | Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | Place of Origin | Huizhou, Guangdong, China |
| Model Number | Please refer to the model numbers in the product catalog | Brand Name | lida&lvhuan |
| High Light | Breathable Permeable Running Track ,Permeable Running Track 13mm ,13mm Athletics Track | ||
Key Advantages: Covers asphalt or concrete directly | Full install in 5–7 days | No specialist curing required | Playable in 48 hours after finishing | Ideal for school holidays
The rapid‑install version of the breathable porous track is designed for fast‑track projects where time on site is limited. Its single‑component binder cures quickly under ambient conditions, and the open‑cell surface does not require perfect base flatness – minor irregularities are absorbed. A 400m track can be overlaid on existing asphalt in 6 days by a 6‑person crew, compared to 12–15 days for traditional systems.
Perfect for school summer breaks, stadium refurbishments before a tournament, or converting tennis courts to multi‑use tracks.
| Parameter | Value |
|---|---|
| Minimum base cure time | Existing asphalt – ready immediately; new concrete – 14 days |
| Installation rate | 600–800 m²/day (team of 6) |
| Time to walk after finish | 24 hours |
| Time for full running | 48 hours |
| Thickness | 10–13mm (can be as low as 8mm for non‑competition) |
| Impact Absorption | 35–42% (slightly firmer for quick install) |
| Weather restriction during install | No rain; temperature 5–35°C |
All other World Athletics training track parameters are met.
Single‑component PU – no field mixing errors, ready to pour.
No primer needed on clean asphalt – saves one day.
Spray coating applied wet‑on‑wet – no drying between layers.
No heavy rollers – simple manual screeding.
School tracks required before term starts
University facilities between semesters
Indoor sports halls converting to multi‑use
Temporary event flooring (can be removed later)
| Step | Traditional PU Track | Rapid Porous Track |
|---|---|---|
| Base preparation | 2 days (grinding + priming) | 0.5 day (pressure wash) |
| Base layer curing | 24h | 6h |
| Top layer + curing | 2 days | 1 day |
| Line marking | 1 day | 0.5 day |
| Total | 12–15 days | 5–7 days |
Bangkok, Thailand – International school needed a new 200m track before a Friday sports day. Installation started Monday morning; Wednesday afternoon the track was playable. Total 3,200 m².
No minimum. Sample panels shipped within 3 days. We provide video call guidance during your first installation day.
Q: Is the durability the same?
→ Yes, 8+ years. The faster process does not compromise chemical cure.
Q: Can we install it ourselves?
→ Yes – we supply full video SOP, written guide, and remote support. Optional paid technician visit.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...
Get in touch with us
Leave a Message, we will call you back quickly!