
Guangdong Lvhuan Environmental Protection Technology Co., Ltd.
| Type | Fast-Lay Rubber Sheet Track |
| Name | Prefabricated Running Track |
| Payment Terms | EXW |
| Top_Layer | EPDM Wear Layer |
| Features | Pre-Cut Panels, Fast Deployment, Uniform Quality |
| Service_Life | 8-10 Years |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation |
| Installation | Adhesive Bonded, 5-7 Day Full |
| Structure | Pre-Cut Vulcanized Rubber Panels |
| Thickness | 8-13mm |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag |
| Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Application | Renovations, Tight Deadlines, Schools |
| Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE |
| Place of Origin | Huizhou, Guangdong, China |
| Model Number | Please refer to the model numbers in the product catalog |
View Detail Information
Explore similar products
Elite Competition Grade Prefabricated Running Track 13mm Rubber Running Track
Custom Sizes Rubber Athletic Track Vulcanized Rubber Race Track
6mm - 10mm Rubber Running Track Multi Purpose EPDM Jogging Track
Eco Friendly Prefabricated Running Track Recycled EPDM Rubber Running Track UV
Product Specification
| Type | Fast-Lay Rubber Sheet Track | Name | Prefabricated Running Track |
| Payment Terms | EXW | Top_Layer | EPDM Wear Layer |
| Features | Pre-Cut Panels, Fast Deployment, Uniform Quality | Service_Life | 8-10 Years |
| Delivery Time | Normal delivery time: Shipment within 15 days after order confirmation | Installation | Adhesive Bonded, 5-7 Day Full |
| Structure | Pre-Cut Vulcanized Rubber Panels | Thickness | 8-13mm |
| Packaging Details | 20kg/barrel,25kg/barrel,30kg/barrel,200kg/barrel, 300kg/barrel, 25kg/bag | Supply Ability | Monthly supply: 1000–12000 tons&The quantity ranges from 500,000 to 2,000,000 square meters, but it mainly depends on the product. |
| Application | Renovations, Tight Deadlines, Schools | Brand Name | lida&lvhuan |
| Certification | ISO 9001 (Quality Management) ,ISO 14001 (Environmental Management),CE | Place of Origin | Huizhou, Guangdong, China |
| Model Number | Please refer to the model numbers in the product catalog | ||
| High Light | 8mm Prefabricated Running Track ,13mm Prefabricated Running Track ,Yellow Custom Running Track | ||
Key Advantages: Factory‑made rolls – no on‑site mixing | Installation speed up to 1,500 m²/day | No curing delays | Consistent thickness (±0.5mm) | World Athletics training standard
The Rapid‑Install Prefabricated Running Track is the ultimate solution for deadline‑driven projects. Supplied in factory‑vulcanised rubber rolls (1.22m or 1.5m wide, up to 15m long), it requires no on‑site mixing of binders or granules – simply unroll, bond to the prepared base, and seal the joints. A standard 400m track can be laid by a 6‑person crew in 5–7 days (after base preparation), compared to 15–20 days for poured‑in‑place systems. The track is ready for line marking and use immediately after joint sealing.
Ideal for school stadiums during short summer breaks, university track renovations between semesters, urban renewal projects with tight handover dates, and clubs needing fast facility upgrades.
| Parameter | Value |
|---|---|
| Thickness | 13mm standard (8mm, 10mm, 15mm available) |
| Roll width | 1.22m or 1.5m (custom available) |
| Installation rate | 1,200–1,500 m²/day (6 workers) |
| Time to use after installation | Immediate (after joint curing, 6–12h) |
| Thickness tolerance | ±0.5mm |
| Impact absorption | 35–45% |
| Service Life | 10–12 years |
All mechanical properties meet World Athletics training track requirements.
Key feature: No weather‑related curing delays – installation continues even in light humidity (avoid rain).
| Step | Poured‑in‑Place Full PU | Prefabricated Rapid |
|---|---|---|
| Base prep | 2 days | 2 days |
| Mixing & pour | 3–5 days (layer by layer) | 0 days (no mixing) |
| Curing | 10–14 days | 0 days (rolls are ready) |
| Joint sealing | N/A | 1 day |
| Total | 15–20 days | 5–7 days |
| Country | Project | Area | Install time | Year |
|---|---|---|---|---|
| Thailand | International school stadium | 3,200 m² | 6 days | 2024 |
| UAE | Community sports complex | 4,500 m² | 7 days | 2025 |
| Mexico | University training track | 2,800 m² | 5.5 days | 2024 |
No MOQ – single roll available. Rolls packed on pallets. Lead time 15–25 days.
Q: Does the track need curing after installation?
→ No. The rolls are fully cured at the factory. Only the adhesive needs 6–12 hours to set before use.
Q: Can it be installed over existing old tracks?
→ Yes, after proper cleaning and levelling. We provide a bonding primer for old asphalt or concrete.
Contact: zhu@ldsflooring.com | WhatsApp +86 18928360800
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2014
Total Annual:
300-1200
Employee Number:
200~300
Ecer Certification:
Verified Supplier
.gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ... .gtr-container-x9y0z1 { font-family: Verdana, Helvetica, "Times New Roman", Arial, sans-serif; color: #333; padding: 16px; line-height: 1.6; max-width: 100%; box-sizing: border-box; } .gtr-container-x9y0z1 .gtr-title-x9y0z1 { ...
Get in touch with us
Leave a Message, we will call you back quickly!