Ecer asks for your consent to use your personal data to:
Personalised advertising and content, advertising and content measurement, audience research and services development
Store and/or access information on a device
Your personal data will be processed and information from your device (cookies, unique identifiers, and other device data) may be stored by, accessed by and shared with 135 TCF vendor(s) and 65 ad partner(s), or used specifically by this site or app.
Some vendors may process your personal data on the basis of legitimate interest, which you can object to by do not consent. Contact our platform customer service, you can also withdraw your consent.
Your message must
be between 20-3,000 characters!
Submit Requirement
Thank You!
Your requirement has been sent. we will contact you quickly!
{"title":"41\u00d782 C-Section Fully Welded Trailing Arm Heavy-Duty Bracket with Full","imgUrl":"https:\/\/img.chinax.com\/nimg\/f8\/74\/5292220d9248fd6ed1b64444a9bf-200x200-1\/41_c3_9782_c_section_fully_welded_trailing_arm_heavy_duty_bracket_with_full.jpg","attrs":{"Application":"Building operations","Payment Terms":"T\/T, PayPal, Xtransfer","Process":"Semi-welding + Stamping Forming","Delivery Time":"Delivery within 15-30 days"}}
{"title":"20\uff5810 Cold Formed Slotted C Channel For Steel Structure And Building Constructio","imgUrl":"https:\/\/img.chinax.com\/nimg\/45\/bc\/7c312c982e6bde2aebeaf0742886-200x200-1\/20_ef_bd_9810_cold_formed_slotted_c_channel_for_steel_structure_and_building_construction.jpg","attrs":{"Place of Origin":"Hebei, China","Thickness":"1.5mm \/ 2.0mm \/ 2.5mm","Application":"Building operations","Price":"$ 0.9-2.4"}}
{"title":"Durable Carbon Steel Yellow Powder Coated C Strut Channel with Smooth Surface","imgUrl":"https:\/\/img.chinax.com\/nimg\/17\/cc\/01e63b493453c342583c993b1e93-200x200-1\/durable_carbon_steel_yellow_powder_coated_c_strut_channel_with_smooth_surface_and_anti_rust_properties_for_construction.jpg","attrs":{"Price":"$ 0.9-2.4","Packaging Details":"Wooden frame or cardboard box packaging, customizable","Surface treatment":"Galvanized Coated\/Powder Coating","Surface Treatment":"High-Temperature Electrostatic Red Powder Coated"}}
{"title":"Durable C Strut Channel with Powder Coated Black Finish Cold Formed Steel","imgUrl":"https:\/\/img.chinax.com\/nimg\/82\/fa\/644f8c280ed3f0087bf0f21dd7a9-200x200-1\/durable_c_strut_channel_with_powder_coated_black_finish_cold_formed_steel_profile_for_mep_systems_photovoltaic_mounting_and_constr.jpg","attrs":{"Place of Origin":"Hebei, China","Suitable for":"Lightweight supports, photovoltaic supports, keels, roof trusses, equipment frames, guardrails, bridge racks, etc","Supply Ability":"50000 pieces per day","Surface treatment":"Galvanized Coated\/Powder Coating"}}
{"title":"Durable Fully Welded Trailing Arm for 41x82 Double Spliced C Strut Channel with","imgUrl":"https:\/\/img.chinax.com\/nimg\/2e\/85\/96c07c72a0d6de9620543809bb31-200x200-1\/durable_fully_welded_trailing_arm_for_41x82_double_spliced_c_strut_channel_with_full_penetration_welding_and_anti_corrosion_surfac.jpg","attrs":{"Application":"Building operations","Payment Terms":"T\/T, PayPal, Xtransfer","Process":"Semi-welding + Stamping Forming","Delivery Time":"Delivery within 15-30 days"}}
{"title":"41x82 Hot Dipped Galvanized Double Spliced C Strut Channel with High Section","imgUrl":"https:\/\/img.chinax.com\/nimg\/24\/65\/c16bbfa7ec1d985d858f4dd3454d-200x200-1\/41x82_hot_dipped_galvanized_double_spliced_c_strut_channel_with_high_section_rigidity_for_large_diameter_pipeline_support.jpg","attrs":{"Certification":"ISO9001","Service":"Custom Metal Fabrication Service","Supply Ability":"50000 pieces per day","Usage":"Construction, Electromechanical, Machinery"}}
{"title":"Red Powder Coated C Channel Strut 1.5mm \/ 2.0mm For Fire Protection System","imgUrl":"https:\/\/img.chinax.com\/nimg\/8a\/6b\/04483473191b109d25fa9eb8e9ae-200x200-1\/red_powder_coated_c_channel_strut_1_5mm_2f_2_0mm_for_fire_protection_system.jpg","attrs":{"Certification":"ISO9001","Feature":"Corrosion Resistant, High Strength, Easy Installation, Modular Design","Supply Ability":"50000 pieces per day","Usage":"Construction, Electromechanical, Machinery"}}
41×82 C-Section Fully Welded Trailing Arm | Heavy-Duty Bracket Fitting for Solar, Cable Tray & Seismic Support Systems
Product Description:
This fully welded trailing arm is a heavy-load core fitting purpose-built for 41×82 double-spliced C-section steel support systems. Fabricated from high-strength structural steel with full-penetration continuous welding technology, it delivers exceptional integral rigidity, vibration resistance and shear strength. It is widely deployed for solar mounting brackets, large-span cable tray supports, seismic bracing systems, factory steel structures and heavy-duty pipeline hanging applications.
Perfectly compatible with standard 41×82 back-to-back double-spliced C channels, the full-welded construction eliminates hidden risks associated with semi-welded joints. The compact integrated structure efficiently distributes heavy loads and improves wind and snow load resistance. It allows flexible position and angle adjustment during on-site assembly. Available with hot-dip galvanized or powder coated anti-corrosion finishes, it delivers long service life and high cost efficiency, making it ideal for industrial plants, municipal infrastructure projects and new energy power station construction.
Parameter Table:
Parameter Name
Specification
Unit
Material
Q235 / Q355 High-Strength Carbon Steel
—
Compatible C-Section Steel
41×82 Double-Spliced C-Strut Channel
mm
Processing Technology
Fully Welded + Stamped Forming
—
Anti-Corrosion Treatment
Hot-Dip Galvanizing / Powder Coating
—
Bearing Capacity
800–3000
N
Applicable Temperature
-40 ~ 80
℃
Service Life
≥15
Year
Installation and Usage Notes:
Pre-installation inspection: Inspect the fully welded trailing arm thoroughly before installation. Confirm there are no cracks, welding defects or rust on the weld seams and main body, and verify that the product specification matches the 41×82 C-section steel to be assembled.
Installation operation: Use professional tools to connect the trailing arm to the 41×82 C-channel. Ensure all welded and bolted joints are tightly fastened without looseness. Do not overload or force-fit components to avoid structural damage.
Positioning adjustment: Align the installation position with the stress points of the entire support system. Adjust the mounting angle according to actual site conditions to achieve uniform load distribution and avoid local stress concentration.
Post-installation inspection: Conduct a comprehensive inspection after installation. Test load-bearing performance and structural stability, and put into service only after all safety requirements are met.
Daily maintenance: Regularly inspect weld seams and connecting parts during service. Maintain or replace components in a timely manner if rust, looseness or deformation is found.
Safety warning: Strictly prohibit operation beyond the rated bearing capacity and applicable temperature range to prevent safety accidents.
Transportation and storage: Avoid heavy collision and extrusion during transportation and storage. Store in a dry and ventilated environment to prevent premature corrosion.
FAQ:
Q: Are you a manufacturing factory or a trading company?
A: We are a professional manufacturing factory specializing in steel structural fittings. You are welcome to visit our workshop at any time. Our facility is equipped with a full set of advanced steel structure processing equipment, which guarantees stable product quality and competitive factory-direct prices.
Q: What is your production lead time?
A: Our sales representative will confirm the exact lead time based on your order details. For bulk orders, please communicate with our production department in advance. Normally production is completed within 30 days after deposit receipt, and partial shipment is acceptable for large-volume orders.
Q: Can you provide customized design services?
A: Yes. Our experienced engineering team can provide tailored solutions according to your project requirements. We supply structural drawings, fabrication details and installation blueprints for your confirmation at different construction stages.
Q: What are your payment terms?
A: 30% deposit in advance, 70% balance settled before shipment.
Q: How do you control product quality?
A: a) Design control: Anticipate potential risks in advance and deliver reliable structural solutions;
b) Raw material control: Only qualified certified steel raw materials are adopted for production;
c) Production control: Precision fabrication techniques, skilled operators and strict in-process quality inspection.
Company Details
Bronze Gleitlager
,
Bronze Sleeve Bushings
and
Graphite Plugged Bushings
from Quality China Factory
Business Type:
Manufacturer,Exporter,Seller
Year Established:
2002
Total Annual:
12000000-15000000
Employee Number:
100~120
Ecer Certification:
Verified Supplier
Yaoguang New Energy Technology Co., Ltd is a China-based manufacturer specializing in C channel steel and cold formed steel sections. Our main products include galvanized C channels, pre-galvanized C purlins, lipped C profiles, slotted C channels, and custom roll formed sections. These products are ... Yaoguang New Energy Technology Co., Ltd is a China-based manufacturer specializing in C channel steel and cold formed steel sections. Our main products include galvanized C channels, pre-galvanized C purlins, lipped C profiles, slotted C channels, and custom roll formed sections. These products are ...