China factories

Chat Now Send Email
China factory - WORKSUN GROUP CO., LTD.

WORKSUN GROUP CO., LTD.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Customized Cuplock System Scaffolding Modular Event Stage Scaffold 2.5m Standard
China Customized Cuplock System Scaffolding Modular Event Stage Scaffold 2.5m Standard

  1. China Customized Cuplock System Scaffolding Modular Event Stage Scaffold 2.5m Standard

Customized Cuplock System Scaffolding Modular Event Stage Scaffold 2.5m Standard

  1. MOQ: 200/Piece
  2. Price: US $8.90 - 12.00/ Piece
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1000 piece in 10 days
Delivery Time 10-30 workday
Packaging Details Bundled / Tied in bundles/Optimization of container loading
Product name Cuplock System Scaffolding
diameter 48mm
thickness 3.0/3.25mm
Quality guarantee 2 year
technology CO2 arc welded
peculiarity Easy Assembling
colour Customized Colour
Surface treatment Painted/Galvanized
Customize or not Available in custom or standard sizes
dimension 1200,1800,2400mm or as your request
Brand Name WKS
Certification ROHS
Place of Origin Hebei,China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1000 piece in 10 days
Delivery Time 10-30 workday Packaging Details Bundled / Tied in bundles/Optimization of container loading
Product name Cuplock System Scaffolding diameter 48mm
thickness 3.0/3.25mm Quality guarantee 2 year
technology CO2 arc welded peculiarity Easy Assembling
colour Customized Colour Surface treatment Painted/Galvanized
Customize or not Available in custom or standard sizes dimension 1200,1800,2400mm or as your request
Brand Name WKS Certification ROHS
Place of Origin Hebei,China
High Light Customized Cuplock System ScaffoldingModular Event Stage ScaffoldEvent Stage Scaffold 2.5m
Cuplock Scaffolding 2.5m Standard for Event Stage and Temporary Grandstand
Product Overview

Cuplock Scaffolding is a versatile modular system featuring a unique cup-and-blade locking mechanism, designed for high-load applications in commercial construction, bridge falsework, and industrial maintenance. It provides exceptional stability and rapid assembly for complex scaffolding structures.

Features & Functions
  • Rapid Cup-Lock Mechanism: Horizontal ledgers are secured by rotating the top cup to lock four connections simultaneously, enabling tool-free assembly 40% faster than traditional scaffolding systems.
  • High Structural Integrity: The 500mm uniform node spacing creates a rigid grid structure capable of supporting concentrated loads up to 4.5 kN/m², ideal for concrete formwork and heavy equipment.
  • Multi-Directional Flexibility: Components connect at 90-degree intervals, allowing versatile configurations for straight walls, circular structures, and complex access towers without special adapters.
  • All-Weather Durability: Hot-dip galvanized finish provides superior corrosion resistance for long-term outdoor use in harsh environments, with minimal maintenance requirements.
Key Specifications
  • Material: Q235B/Q345B Structural Steel
  • Standard Tube: Ø48.3mm x 2.75mm/3.0mm
  • Node Spacing: 500mm standard, 750mm available
  • Max Working Height: 60m+ with proper bracing
  • Load Capacity: 4.0-4.5 kN/m² (Heavy Duty)
  • Surface Treatment: Hot-Dip Galvanized 85μm
Competitive Advantages
  • Optimal Labor Efficiency: One worker can assemble multiple connections simultaneously, reducing crew size requirements by 30% compared to frame scaffolding systems.
  • Enhanced Safety Performance: The positive mechanical lock eliminates accidental disassembly, while the rigid structure meets EN12811 safety standards for high-level work.
  • Long-Term Economic Value: 500+ reuse cycles with proper maintenance provide the lowest cost-per-use ratio in the heavy-duty scaffolding category, with full component recyclability.
Cuplock Scaffolding system overview
Product Parameters - Standards (Uprights)
Item No. Length Weight Picture
BSCS 300 3m/9'10" 17.5kg/38.25 Ibs BSCS 300 Standard
BSCS 250 2.5 m/8'2" 14.57 kg/32.12 Ibs  
BSCS 200 2m/6'2" 11.82 kg/26.07 Ibs  
BSCS 150 1.5 m/4'11" 9.05 kg/19.95 Ibs  
BSCS 100 1 m/3'3" 6.3 kg/13.91 Ibs  
BSCS O50 0.5m/1'8" 3.5 kg /7.77 Ibs  
Product Parameters - Ledgers (Horizontal Braces)
Item No. Length Weight Picture
BSCL 250 2.5 m/8'2" 9.35 kg/20.61 Ib BSCL 250 Ledger
BSCL 180 1.8 m/6' 6.85 kg / 15.1 Ibs  
BSCL 150 1.5 m/4'11" 5.75 kg/9.46 Ibs  
BSCL 120 1.2m/4 4.29 kg/13.91 Ibs  
BSCL 090 0.9m/3' 3.55 kg /7.83 Ibs  
BSCL 060 0.6m/2' 2.47 kg / 5.45 Ibs  
Our Services
  • Customized Production Services: Professional engineering team provides detailed product application solutions based on your project drawings.
  • Timely Response Service: Professional engineers available before, during, and after sales to promptly solve and meet your needs.
  • Worry-Free After-Sales Service: One-on-one service teams to help complete implementation and landing of engineering projects.
Frequently Asked Questions

Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for operating export business of formwork and scaffolding products. Our group has two major production bases with over 20 years of production experience.

How can I get a quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop an application plan based on your engineering drawings.

How long does it usually take to complete the plan and quotation?
Generally 5-8 days to complete specific plans and detailed quotations.

Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.

How long is the estimated delivery time after the contract is signed?
Usually 30-60 days depending on project complexity. More accurate delivery times are provided during planning.

Is the plastic template prone to deformation?
In long-term high temperature environments, slight deformation may occur. We recommend aluminum alloy formwork or steel frame wood formwork for high temperature areas.

What are the defects of the plastic template system?
Limited load capacity for large-sized concrete structures and poor high temperature resistance with potential deformation in high-temperature areas.

What is the payment method you require?
Payments ≤1,000USD: 100% in advance. Payments ≥10,000USD: 30% T/T in advance, balance before shipment. L/C also accepted.

Cuplock Scaffolding system application in construction project

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2024-07-30

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H... Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H...

+ Read More

Get in touch with us

  • Reach Us
  • WORKSUN GROUP CO., LTD.
  • Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
  • https://www.wksscaffold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement