| Charge/Discharge Rate | ≤0.5 CP |
| Cabinet Protection | IP54 |
| Max Parallel Expansion | 2.5 MW; project design |
| Delivery Time | Confirmed in the project quotation |
| Packaging Details | Packing and shipping dimensions to be confirmed for the ordered configuration. |
| Payment Terms | T/T |
| Nominal Battery Energy | 261.248 kWh |
| Dimensions W×D×H | 1400×1400×2200 mm |
| Rated DC Voltage | 832 V |
| Grid AC Voltage | 400 V ±10% |
| Communication | Ethernet / RS485 |
| Corrosion Protection | C4 |
| Supply Ability | 5 units |
| Battery Chemistry | LFP |
| Frequency | 50 / 60 Hz |
| Installation | Outdoor |
| DC Voltage Range | 728–936 V |
| Battery Compartment | IP55 |
| Rated AC Current | 180 A |
| Cooling | Liquid + air cooling |
| Rated AC Power | 125 kW |
| Weight | 2500 +5% kg; datasheet |
| Cell Capacity | 314 Ah |
| Solution Provider | YINTU |
| Model Number | YT-C&I ESS-125kW/261kWh-CE |
| Brand Name | YINTU |
View Detail Information
Explore similar products
Integrated Commercial & Industrial Energy Storage IP65 Protection 250 KW Hybrid
150.5 KWh Commercial And Industrial Energy Storage Smart Temp Control Fire
52 KWh / 25 KW Hybrid ESS Energy Storage Cabinets IP54 For Commercial Industrial
Customized Industrial Commercial Energy Storage Cabinets 125 KW 261 KWh Liquid
Product Specification
| Charge/Discharge Rate | ≤0.5 CP | Cabinet Protection | IP54 |
| Max Parallel Expansion | 2.5 MW; project design | Delivery Time | Confirmed in the project quotation |
| Packaging Details | Packing and shipping dimensions to be confirmed for the ordered configuration. | Payment Terms | T/T |
| Nominal Battery Energy | 261.248 kWh | Dimensions W×D×H | 1400×1400×2200 mm |
| Rated DC Voltage | 832 V | Grid AC Voltage | 400 V ±10% |
| Communication | Ethernet / RS485 | Corrosion Protection | C4 |
| Supply Ability | 5 units | Battery Chemistry | LFP |
| Frequency | 50 / 60 Hz | Installation | Outdoor |
| DC Voltage Range | 728–936 V | Battery Compartment | IP55 |
| Rated AC Current | 180 A | Cooling | Liquid + air cooling |
| Rated AC Power | 125 kW | Weight | 2500 +5% kg; datasheet |
| Cell Capacity | 314 Ah | Solution Provider | YINTU |
| Model Number | YT-C&I ESS-125kW/261kWh-CE | Brand Name | YINTU |
| High Light | Liquid Cooled Energy Storage Solutions ,261 KWh Energy Storage Cabinet ,Integrated C&I Storage Cabinet | ||
COMMERCIAL & INDUSTRIAL ENERGY STORAGE SOLUTIONS
A 125 kW AC storage cabinet with 261.248 kWh of nominal LFP battery energy for commercial and industrial energy management. This CE-version configuration is designed for projects that need a compact outdoor storage unit, liquid-cooled batteries and coordinated on-grid or off-grid operation.
The cabinet integrates five battery packs, PCS, BMS, EMS, liquid cooling and a control box. Its source configuration is YTDS5T261L-P0125S (Smart261L-CE). Solar integration in the concept shown below uses an external PV inverter on the AC bus; a direct PV DC input is not specified for this cabinet.
YINTU is an energy storage solution provider. We work with capable manufacturing partners to match equipment, system configuration and project services to each customer's commercial or industrial site.
Use scheduled charging and discharging to manage short demand peaks from production equipment and common services. YINTU starts with interval demand data, transformer limits and tariff periods to define an operating schedule and battery reserve. Savings depend on the site's actual load and tariff structure.
Add storage alongside an existing PV inverter to move available daytime solar energy toward later consumption. The project design coordinates the PV inverter, metering and EMS, including any export limits. This AC-coupled arrangement is suitable for assessment where a working rooftop PV system is already installed.
Plan storage around refrigeration cycles, loading equipment, lighting and other essential services. Separating priority loads helps set a realistic backup objective. Motor-starting demand and the required autonomy must be checked before confirming an off-grid configuration.
Use the cabinet as part of a demand-management scheme when vehicle charging overlaps with site production or building demand. Charging schedules, connection capacity and available battery energy determine how much peak buffering is practical.
The datasheet lists parallel expansion up to 2.5 MW. A multi-cabinet project requires a coordinated electrical layout, controls, protection and grid-interface review. VPP participation is assessed only where local rules, communications and commercial arrangements permit.
Five LFP packs and the power-conversion, battery-management and energy-management functions are packaged in one cabinet, helping simplify equipment coordination for a site-specific solution.
The source specifies intelligent battery liquid cooling, C4 corrosion protection, IP54 for the cabinet and IP55 for the battery compartment. These are distinct protection ratings and must be matched to the installation environment.
The datasheet reports up to 99% SiC PCS conversion efficiency. This is a PCS value, not whole-system round-trip efficiency. Local operation, cloud/OTA capabilities and remote diagnostics are listed; project communications and access arrangements are confirmed separately.
The datasheet describes dual monitoring, fault isolation and multiple venting/fire-protection measures. The final fire-protection arrangement, site emergency response and installation clearances are established in the approved equipment and project documents.
The conceptual AC-coupled arrangement connects the storage cabinet, utility grid, external PV inverter and commercial loads through the site AC bus. The EMS coordinates the storage operating schedule. Backup or island operation requires suitable isolation, switching and protection; the drawing does not imply that an existing site is automatically ready for off-grid operation.
| Parameter | Specification |
|---|---|
| Model | YT-C&I ESS-125kW/261kWh-CE |
| Source configuration | YTDS5T261L-P0125S (Smart261L-CE) |
| Battery chemistry / cell rating | LFP; 3.2 V / 314 Ah |
| Nominal battery energy | 261.248 kWh |
| Rated DC voltage | 832 V |
| DC voltage range | 728–936 V |
| Charge/discharge rate | ≤0.5 CP |
| Battery cooling | Intelligent liquid cooling |
| Parameter | Specification |
|---|---|
| Rated AC power / current | 125 kW / 180 A |
| Grid-connected AC voltage | 400 V ±10% |
| Rated frequency | 50 / 60 Hz |
| Frequency range | 45–55 Hz / 55–65 Hz |
| Current distortion | THDi <3% at rated power |
| Power factor | >0.99 at rated power; adjustable from -1 (leading) to +1 (lagging) |
| Off-grid voltage / frequency | 400 V ±5%; 50 / 60 Hz |
| Off-grid voltage distortion | <3% with linear load |
| PCS conversion efficiency | Up to 99%, as stated in the datasheet |
| Maximum parallel expansion | 2.5 MW; subject to approved system architecture |
| Operating modes | Grid-tied, off-grid and VPP; project conditions apply |
| Parameter | Specification |
|---|---|
| Installation / system cooling | Outdoor; liquid cooling + air cooling |
| Ingress protection | IP54 cabinet; IP55 battery compartment |
| Corrosion protection | C4 |
| Fire protection | Datasheet: Aerosol + water-based fire protection (optional); confirm final arrangement |
| Operating temperature | -20°C to 45°C; datasheet notes derating above 45°C |
| Storage temperature | -20°C to 35°C for ≤6 months; -20°C to 45°C for ≤1 month |
| Recommended storage SOC | 20–50% |
| Humidity | 0–95% RH, non-condensing |
| Altitude | Within 4,000 m; derating above 2,000 m |
| Daily cycling limit | Maximum 2 charges and 2 discharges per day |
| Dimensions (W × D × H) | 1,400 × 1,400 × 2,200 mm |
| Weight | 2,500 +5% kg, as written in the datasheet; confirm shipping weight |
| Parameter | Specification |
|---|---|
| Communication interfaces | Ethernet / RS485 |
| Protocols | Modbus TCP / IEC 104 / Modbus RTU |
| Listed standards | IEC 62619; IEC 60730; IEC 61000; IEC 62477; EN 50549 |
| Listed grid references | VDE 4105 / 4110 / 4120 |
| Transport references | UN38.3; UN3480 is a transport classification |
| Document scope | CE Version is the product designation. Confirm certificates, test reports and applicable grid approvals for the ordered configuration. |
Identify whether the priority is peak management, solar self-consumption, backup or microgrid operation. Use the actual load profile and generation resources to set the power, energy and operating reserve.
YINTU coordinates equipment selection and technical clarification with the manufacturing partner, including voltage, controls, environment, expansion and optional functions.
The project quotation defines the cabinet configuration, external switchgear, protection and metering, PV equipment, generator interface, transport, commissioning support and after-sales responsibilities. External equipment and on-site works are included only when expressly specified. Warranty, lead time and commercial terms are confirmed in the agreed quotation.
A direct PV DC input is not specified in this datasheet. The solution shown uses an external PV inverter connected to the site AC bus. PV-inverter compatibility and EMS coordination are reviewed for each project.
No. Runtime depends on actual load, allowed state-of-charge range, reserve settings, conversion losses, temperature and equipment limits. Power and energy must both be checked against the required duty.
The datasheet lists standards and grid-code references. The applicable certificate scope, firmware, network settings and local utility requirements must be checked for the exact project and delivered configuration.
YINTU provides solution selection, project coordination and supply support through manufacturing partners. The final quotation identifies the equipment and service responsibilities.
Send YINTU your location, grid voltage and frequency, interval load data, peak demand, PV capacity, generator details, required backup loads and operating hours. We will coordinate equipment selection and a project-specific configuration for technical review.
Specifications are transcribed from the supplied YINTU datasheets and remain subject to the confirmed configuration and approved technical documents. Nominal battery energy is not usable AC energy. Application images and topology diagrams are illustrative concepts, not completed project references. Final installation, protection, source switching and grid approval must follow the site design.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2016
Total Annual:
$ 10 million-$ 20,million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...
Get in touch with us
Leave a Message, we will call you back quickly!