| Payment Terms | L/C, T/T |
| Supply Ability | 1000 Piece / year |
| Delivery Time | 30-45 work days |
| Packaging Details | Pallet |
| Material | Q235 Steel, timber beam,Plywood |
| Color | Silver, yellow,brown |
| Size | Width 2400mm |
| Application | Tower, core of highrise building, shiplift |
| Product name | Crane lift climbing formwork |
| Type | Wall Formwork, Steel formwork,Column formwork,Climbing formwork |
| Brand Name | Forpro |
| Model Number | Crane lifted formwork CF240 |
| Certification | ISO and CE |
| Place of Origin | shanghai |
View Detail Information
Explore similar products
High Efficiency Climbing Scaffold System For Core Wall And Bridge Concrete
Safety Concrete Climbing Scaffolding Formwork 2.2m Main Platform
Crane lifted Climbing Formwork System for Core Wall and Bridge Concrete
High Load Bearing Climbing Formwork System For Dam And Bridge Abutment
Product Specification
| Payment Terms | L/C, T/T | Supply Ability | 1000 Piece / year |
| Delivery Time | 30-45 work days | Packaging Details | Pallet |
| Material | Q235 Steel, timber beam,Plywood | Color | Silver, yellow,brown |
| Size | Width 2400mm | Application | Tower, core of highrise building, shiplift |
| Product name | Crane lift climbing formwork | Type | Wall Formwork, Steel formwork,Column formwork,Climbing formwork |
| Brand Name | Forpro | Model Number | Crane lifted formwork CF240 |
| Certification | ISO and CE | Place of Origin | shanghai |
| High Light | climbing scaffolding system ,self climbing scaffold system | ||
Intelligent Modular Climbing Scaffolding with Formwork to Construct High-rise Building
Description
The Climbing Formwork CF240 is a crane lifted climbing formwork. With its high loadability, it is designed for precise and convienient operation for all high-rise projects, It is an ideal option for pylons,piers and towers projects etc. It provides multi level platform for formwork operation, concrete pouring,reinforcement installation and concrete surface repairing. The whole system is anchored in the stucture during the whole working process, the modular elements can be adjusted to fit any angle of wall inclination.
Elements
• Large area formwork panel or steel frame formwork or steel formwork
• Modular climbing brackets CF240
• Panel travelling unit
• Anchoring system 20.0
Features
• Platform width: 2.40m
• Formwork move back 70cm from the concrete wall, leave enough space for formwork cleaning
• 3 or 4 levels of platform level can be adjusted to meet structure inclination up to 150
• Climbing scaffolding is safely anchored on concrete structure with high strength anchor parts.
• Together with self climber to work as self climbing formwork system
Climbing Formwork Installation Process
![]()
Applications scope
![]()
Forpro Service
Provide support in every stage of projects
1.Provide cosult when client take part in projects bid invitation.
2.Provide optimized formwork tender solution to assitant client to win the project.
3.Developing formwork design, refining initial plan, and exploring relation limit between supply&demand.
4.Start to design the formwork detailedly according to the winning bidding.
5.Provide economic formwork solution package and provide continous on-site support service.
Company Details
Business Type:
Manufacturer,Trading Company,Seller,Other
Year Established:
2015
Total Annual:
11000000USD-15000000
Employee Number:
85~100
Ecer Certification:
Active Member
ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f... ForPro Formwork Technology (Shanghai) Co., Ltd. is a professional formwork technology company focusing on formwork system research and development, design and production. Our own brand "ForPro", derived from Formwork • Profession, represents the our development philosophy: f...
Get in touch with us
Leave a Message, we will call you back quickly!