| Filling Heads | 6 ceramic piston pumps |
| Main Material | 316L stainless steel contact parts |
| Supply Ability | 10 Sets per Month |
| Control System | PLC + 10-inch HMI touchscreen |
| Power Supply | 380V / 50Hz, 3-phase (customizable) |
| Washing Method | Vertical ultrasonic + independent water/air |
| Sterilization | Dry-heat 280-315°C laminar flow |
| Filling Accuracy | ±0.5% - ±2% |
| Breakage Rate | ≤1% |
| Clarity Rate | >99% |
| Sealing Method | Oxygen-natural gas flame pull-seal |
| Payment Terms | T/T, L/C |
| Delivery Time | 45-60 Working Days |
| Packaging Details | Fumigated Plywood Export Crate with VCI Film |
| Production Speed | 30000 pcs/h |
| Ampoule Size Range | 5ml |
| Model Number | AGF-5-30000 |
| Brand Name | ECER |
| Certification | CE, ISO 9001, GMP |
| Place of Origin | China |
View Detail Information
Explore similar products
Automated Ampoule Filling And Sealing Machine For Serum Filling, 1-20ml
Integrated Anti-Leak Ampoule Washing, Filling, and Sealing Line High-Speed
Integrated Aseptic Ampoule Processing Line (1-20ml) Dedicated Turnkey Automation
Integrated Aseptic Ampoule Processing and Sealing Line (1-20ml) Zero-Contaminati
Product Specification
| Filling Heads | 6 ceramic piston pumps | Main Material | 316L stainless steel contact parts |
| Supply Ability | 10 Sets per Month | Control System | PLC + 10-inch HMI touchscreen |
| Power Supply | 380V / 50Hz, 3-phase (customizable) | Washing Method | Vertical ultrasonic + independent water/air |
| Sterilization | Dry-heat 280-315°C laminar flow | Filling Accuracy | ±0.5% - ±2% |
| Breakage Rate | ≤1% | Clarity Rate | >99% |
| Sealing Method | Oxygen-natural gas flame pull-seal | Payment Terms | T/T, L/C |
| Delivery Time | 45-60 Working Days | Packaging Details | Fumigated Plywood Export Crate with VCI Film |
| Production Speed | 30000 pcs/h | Ampoule Size Range | 5ml |
| Model Number | AGF-5-30000 | Brand Name | ECER |
| Certification | CE, ISO 9001, GMP | Place of Origin | China |
| High Light | 5ml sterilizing ampoule filling machine ,ISO 5 laminar ampoule sealing line ,30000 pcs/h synchronized flame sealing | ||
Legacy ampoule lines with push-button control panels and analog gauges provide no electronic batch record (EBR) capability, forcing operators to manually log critical process parameters every 30 minutes. For 5ml injectable products, missing data entries during 8-hour shifts create 21 CFR Part 11 compliance gaps that trigger audit findings and require retrospective justification.
CauseThe gap between machine-level automation and enterprise-level electronic batch records exists because legacy PLCs (pre-2015 generation) lack OPC-UA server capability and Ethernet/IP communication protocols. Without a unified data historian collecting 1Hz process data from all stations, manual logsheets remain the only regulatory compliance tool—introducing human error rates of 3-8% per FDA 483 observation statistics for aseptic manufacturing.
SolutionOur HMI-integrated line control system features a S7-1500 PLC with native OPC-UA server capability, logging all critical process parameters (temperature, pressure, fill weight, seal integrity) at 10Hz to an onboard SQL database with 500GB storage. Electronic batch records are auto-generated in PDF format with 21 CFR Part 11 compliant electronic signatures, eliminating manual logsheets and providing complete traceability from raw ampoule lot to finished product batch.
Key Features| Parameter | Specification |
|---|---|
| Ampoule Compatibility | 5ml (GB 2637 / ISO 9187 Type I borosilicate glass) |
| Production Capacity | 30000 ampoules per hour |
| Washing Method | Vertical ultrasonic (25kHz) + independent WFI water/air rinsing |
| Sterilization Temperature | 280-315°C, laminar-flow HEPA H14 filtered |
| Filling Accuracy | ±0.5% (servo ceramic piston, 5ml fill volume) |
| Filling Heads | 6 ceramic piston pumps, individually servo-driven |
| Sealing Method | Oxygen-natural gas flame, synchronized pull-seal with IR pyrometer feedback |
| Clarity Rate | >99% (post-wash inline camera inspection, 360° rotation capture) |
| Breakage Rate | ≤1% (whole-line, validated across 1M+ ampoules) |
| Control System | S7-1500 PLC + 10-inch HMI touchscreen, 50-recipe storage |
| Power Supply | 380V / 50Hz, 3-phase (60Hz / 440V customizable) |
| Line Footprint | 10500 x 1,800 x 2,200 mm (L x W x H) |
| Cleanroom Classification | ISO 7 (Class 10,000) room; filling zone ISO 5 (Class 100) laminar |
For 5ml ampoule production at 30000 pcs/h, this model suits facilities producing 240-480k ampoules per single/double shift. Select this capacity tier when your annual demand falls between 60-120 million ampoules. For start-up or clinical trial supply with lower initial volumes, consider our 20000 pcs/h variant. For high-volume commercial manufacturing, step up to the 40000 pcs/h model. Verify ampoule dimensional conformance to GB 2637 or ISO 9187, and confirm your product viscosity is <200 cP at filling temperature for optimal ±0.5% accuracy.
ApplicationsSuitable for pharmaceutical injectable products requiring aseptic processing in 5ml ampoule format. Ideal for hospital pharmacy sterile compounding centers, contract manufacturing organizations (CMOs) serving generic injectable markets, veterinary pharmaceutical manufacturers, and research institutions producing clinical trial materials under GMP conditions. Compatible with aqueous solutions, oil-based formulations, and suspensions with viscosity below 200 cP at filling temperature.
FAQQ: What is the typical IQ/OQ/PQ validation timeline?
A: Site acceptance testing requires 5-7 working days covering mechanical commissioning, sterilization cycle verification with biological indicators (Bacillus atrophaeus spores), and three consecutive media-fill runs per ISO 13408-1. A complete validation documentation package with executed protocols and raw data is provided.
Q: Can the line process amber or colored glass ampoules?
A: Yes. Optical inspection parameters and IR pyrometer emissivity settings are adjustable for amber glass (ε ≈ 0.85) versus clear borosilicate (ε ≈ 0.65). Pre-production trials with your specific glass vendor are recommended to optimize flame-sealing torch parameters for different glass thermal absorption characteristics.
Q: What preventive maintenance is required?
A: Daily: clean ultrasonic bath and rinse nozzles, verify HEPA differential pressure. Weekly: calibrate filling pumps against certified reference weights, inspect flame-seal burner tips for carbon deposits. Monthly: validate HEPA filter integrity via DOP testing, check starwheel bearing play. Annual: full mechanical overhaul including replacement of all dynamic seals and servo motor encoder verification.
Q: Is the line compatible with CIP/SIP systems?
A: The product-contact fluid path (ceramic pistons, 316L manifolds, silicone tubing and filling needles) supports Clean-in-Place with automated wash cycles using 75°C WFI. All product-contact components are designed for tool-free disassembly in under 5 minutes for manual cleaning and autoclave sterilization at 121°C for 30 minutes.
Company Details
Business Type:
Manufacturer
Year Established:
2013
Total Annual:
5,000,000-10,000,000
Employee Number:
50~200
Ecer Certification:
Verified Supplier
Since opening our doors in 2013, Suzhou Lingyao Intelligent Equipment Co., Ltd. has built a solid reputation for providing innovative and reliable solutions to businesses across multiple industries. We offer a comprehensive range of products, from intelligent liquid filling lines to advanced labelin... Since opening our doors in 2013, Suzhou Lingyao Intelligent Equipment Co., Ltd. has built a solid reputation for providing innovative and reliable solutions to businesses across multiple industries. We offer a comprehensive range of products, from intelligent liquid filling lines to advanced labelin...
Get in touch with us
Leave a Message, we will call you back quickly!