China factories

Chat Now Send Email
China factory - WORKSUN GROUP CO., LTD.

WORKSUN GROUP CO., LTD.

  • China,Beijing ,Beijing
  • Verified Supplier
  1. Home
  2. Products
  3. About Us
  4. Contact Us

Leave a Message

we will call you back quickly!

Submit Requirement
China Flexible Cuplock Scaffolding System Rigid Access Tower Scaffold Customized
China Flexible Cuplock Scaffolding System Rigid Access Tower Scaffold Customized

  1. China Flexible Cuplock Scaffolding System Rigid Access Tower Scaffold Customized

Flexible Cuplock Scaffolding System Rigid Access Tower Scaffold Customized

  1. MOQ: 200/Piece
  2. Price: US $8.90 - 12.00/ Piece
  3. Get Latest Price
Payment Terms T/T
Supply Ability 1000 piece in 10 days
Delivery Time 10-30 workday
Packaging Details Bundled / Tied in bundles/Optimization of container loading
Product name Cuplock Scaffolding System
diameter 48mm
thickness 3.0/3.25mm
Quality guarantee 2 year
peculiarity Easy Assembling
technology CO2 arc welded
Surface treatment Painted/Galvanized
colour Customized Colour
dimension 1200,1800,2400mm or as your request
Customize or not Available in custom or standard sizes
Brand Name WKS
Certification ROHS
Place of Origin Hebei,China

View Detail Information

Inquiry by Email Get Latest Price
Chat online Now Ask for best deal
  1. Product Details
  2. Company Details

Product Specification

Payment Terms T/T Supply Ability 1000 piece in 10 days
Delivery Time 10-30 workday Packaging Details Bundled / Tied in bundles/Optimization of container loading
Product name Cuplock Scaffolding System diameter 48mm
thickness 3.0/3.25mm Quality guarantee 2 year
peculiarity Easy Assembling technology CO2 arc welded
Surface treatment Painted/Galvanized colour Customized Colour
dimension 1200,1800,2400mm or as your request Customize or not Available in custom or standard sizes
Brand Name WKS Certification ROHS
Place of Origin Hebei,China
High Light Flexible Cuplock Scaffolding SystemRigid Access Tower ScaffoldAccess Tower Scaffold Customized
Cuplock Scaffolding with 1.8m Ledger and 2.0m Standard for Access Tower
Overview
Cuplock Scaffolding is a high-load modular system designed for fast assembly in building facades, bridge decks, and heavy-duty shoring. It uses a unique cup-and-blade locking mechanism on vertical standards, eliminating the need for loose bolts and enabling rapid, tool-free erection for large-scale projects.
Features & Functions
  • Tool-Free Quick Locking: Horizontal ledgers lock into welded cups with a simple hammer-driven twist. This design allows a single worker to secure multiple connections in seconds, drastically reducing assembly and dismantling time compared to tube-and-coupler systems.
  • High Load Capacity & Rigidity: Engineered with high-yield steel tubes and forged blade connections, the system provides exceptional axial strength and lateral stability, making it ideal for supporting heavy concrete pours and formwork loads.
  • Modular Flexibility: Standard 500mm cup spacing allows for precise height adjustments and easy adaptation to various floor heights and platform levels without custom cutting.
  • Enhanced Safety & Durability: The positive mechanical lock prevents accidental disengagement, while hot-dip galvanized finish ensures long-term corrosion resistance in harsh environments.
Key Specifications
  • Material: High-Yield Steel Q345 (S355)
  • Standard Tube: 48.3mm OD x 3.2mm / 4.0mm Wall Thickness
  • Cup Spacing: 500mm (Standard Intervals)
  • Load Capacity: Up to 30-40 kN per standard leg (varies by bracing)
  • Surface Finish: Hot-Dip Galvanized (HDG)
Competitive Advantages
  • Superior Cost Efficiency: Faster assembly translates to significant labor cost savings. The system offers a lower total cost of ownership than ringlock for standard rectangular layouts, with high reusability and minimal maintenance.
  • Optimized for Speed: The intuitive connection system requires no specialized skills or tools, enabling crews to erect structures up to 40% faster than traditional scaffolding.
  • Reduced Component Loss: With no small loose parts like nuts or bolts, the system minimizes inventory loss and simplifies site management.
Cuplock Scaffolding System
Product Parameters
Standards (Uprights)
Item No. Length Weight Picture
BSCS 300 3m/9'10" 17.5kg/38.25 Ibs BSCS 300 Standard
BSCS 250 2.5 m/8'2" 14.57 kg/32.12 Ibs  
BSCS 200 2m/6'2" 11.82 kg/26.07 Ibs  
BSCS 150 1.5 m/4'11" 9.05 kg/19.95 Ibs  
BSCS 100 1 m/3'3" 6.3 kg/13.91 Ibs  
BSCS O50 0.5m/1'8" 3.5 kg /7.77 Ibs  
Ledgers (Horizontal Braces)
Item No. Length Weight Picture
BSCL 250 2.5 m/8'2" 9.35 kg/20.61 Ib BSCL 250 Ledger
BSCL 180 1.8 m/6' 6.85 kg / 15.1 Ibs  
BSCL 150 1.5 m/4'11" 5.75 kg/9.46 Ibs  
BSCL 120 1.2m/4 4.29 kg/13.91 Ibs  
BSCL 090 0.9m/3' 3.55 kg /7.83 Ibs  
BSCL 060 0.6m/2' 2.47 kg / 5.45 Ibs  
Our Services
  • Customized Production Services: Professional engineering team provides detailed product application solutions based on your project drawings.
  • Timely Response Service: Professional engineers available before, during, and after sales to promptly solve and meet your needs.
  • Worry-Free After-Sales Service: One-on-one service teams to help complete implementation and landing of engineering projects.
Frequently Asked Questions
Are you a trading company or a manufacturer?
We are a subsidiary foreign trade company of a group company, responsible for operating export business of formwork and scaffolding products. Our group has two major production bases with over 20 years of production experience.
How can I get a quotation?
For simple projects with your own engineer, provide a bill of materials. For complex projects like apartments and residences, our consultants will develop an application plan based on your engineering drawings.
How long does it usually take to complete the plan and quotation?
Generally 5-8 days to complete specific plans and detailed quotations.
Can you provide free samples?
Yes, we can provide samples. You will need to pay for the shipping cost.
How long is the estimated delivery time after the contract is signed?
Usually 30-60 days depending on project complexity. More accurate delivery times are provided during planning.
Is the plastic template prone to deformation?
In long-term high temperature environments, slight deformation may occur. We recommend aluminum alloy formwork or steel frame wood formwork for high temperature areas.
What are the defects of the plastic template system?
Limited load capacity for large-sized concrete structures and poor high temperature resistance with potential deformation in high-temperature areas.
What is the payment method you require?
Payments ≤1,000USD: 100% in advance. Payments ≥10,000USD: 30% T/T in advance, balance before shipment. L/C also accepted.
Cuplock Scaffolding system application in construction project

Company Details

Bronze Gleitlager

,

Bronze Sleeve Bushings

 and 

Graphite Plugged Bushings

 from Quality China Factory
  • Business Type:

    Manufacturer,Trading Company

  • Year Established:

    2024-07-30

  • Employee Number:

    150~200

  • Ecer Certification:

    Verified Supplier

Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H... Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H...

+ Read More

Get in touch with us

  • Reach Us
  • WORKSUN GROUP CO., LTD.
  • Beijing Beijing Daxing Room 605, 6th Floor, Building 3, Yard 1, Zhongliang Road, Beijing Economic And Technological Development Zone (Daxing)
  • https://www.wksscaffold.com/

Leave a Message, we will call you back quickly!

Email

Check your email

Phone Number

Check your phone number

Requirement Details

Your message must be between 20-3,000 characters!

Submit Requirement