| Delivery Time | 10-30 workday |
| technology | CO2 arc welded |
| diameter | 48mm |
| Supply Ability | 1000 piece in 10 days |
| peculiarity | Easy Assembling |
| Payment Terms | T/T |
| Surface treatment | Painted/Galvanized |
| thickness | 3.0/3.25mm |
| Packaging Details | Bundled / Tied in bundles/Optimization of container loading |
| Quality guarantee | 2 year |
| colour | Customized Colour |
| dimension | 1200,1800,2400mm or as your request |
| Customize or not | Available in custom or standard sizes |
| Product name | Cuplock Scaffolding System |
| Certification | ROHS |
| Place of Origin | Hebei,China |
| Brand Name | WKS |
View Detail Information
Explore similar products
High Load Cuplock Scaffolding for Construction and Heavy Support Work
Customized Cuplock System Scaffolding Modular Event Stage Scaffold 2.5m Standard
Painted / Galvanized Cuplock Scaffolding System Robust Flexible Scaffolding
Corrosion Protection Cup Lock Scaffold High Load Capacity Access Tower
Product Specification
| Delivery Time | 10-30 workday | technology | CO2 arc welded |
| diameter | 48mm | Supply Ability | 1000 piece in 10 days |
| peculiarity | Easy Assembling | Payment Terms | T/T |
| Surface treatment | Painted/Galvanized | thickness | 3.0/3.25mm |
| Packaging Details | Bundled / Tied in bundles/Optimization of container loading | Quality guarantee | 2 year |
| colour | Customized Colour | dimension | 1200,1800,2400mm or as your request |
| Customize or not | Available in custom or standard sizes | Product name | Cuplock Scaffolding System |
| Certification | ROHS | Place of Origin | Hebei,China |
| Brand Name | WKS | ||
| High Light | 120 kN Maximum Leg Load Cuplock Scaffolding System ,Hot-Dip Galvanized Finish Cuplock Scaffolding ,Easy Assembling Modular Scaffolding | ||
The Cuplock Scaffolding System is a proven modular steel scaffold widely adopted for general construction, bridge falsework, and heavy-load formwork support. Its distinctive cup-and-blade connection mechanism enables rapid assembly with a simple hammer blow. Manufactured from high-strength steel with a hot-dip galvanized finish, this system delivers reliable performance across thousands of project sites worldwide.
With a maximum leg load of 120 kN and full compliance with international scaffolding standards, Cuplock scaffolding offers an optimal balance of strength, speed, and cost-effectiveness for mid-to-large scale construction projects.
We offer full customization to suit your project requirements:
| Parameter | Specification |
|---|---|
| Material | High-Strength Steel |
| Vertical Pipe | Heavy-duty steel pipe with precision welding |
| Cup Spacing | 1.0m intervals on standards |
| Cup Type | Fixed lower cup + sliding upper cup (welded) |
| Blade (Spigot) | Welded to ledger and diagonal ends |
| Max Leg Load | 120 kN (at 1.2m × 1.2m spacing) |
| Finish | Hot-dip galvanized (heavy-duty coating) |
| Quality Assurance | Internationally recognized quality standards |
| Leg Spacing | Max Safe Working Load |
|---|---|
| 1.2m × 1.2m | 100 - 120 kN |
| 1.5m × 1.5m | 60 - 80 kN |
| 1.8m × 1.8m | 40 - 50 kN |
Load capacity decreases with height; engineering calculation required for project-specific designs.
Company Details
Business Type:
Manufacturer,Trading Company
Year Established:
2024-07-30
Employee Number:
150~200
Ecer Certification:
Verified Supplier
Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H... Founded in 1993, WORKSUN GROUP is a seasoned leading enterprise in China's formwork and scaffolding industry. With 32 years of steady development, it has evolved into a large comprehensive private enterprise integrating R&D, production, sales, and services of formwork and scaffolding products. H...
Get in touch with us
Leave a Message, we will call you back quickly!