| Battery Cluster | 2P260S x 2 |
| Frequency | 50/60 Hz |
| Ingress Protection | IP54 |
| Packaging Details | Transport protection and trailer/chassis scope agreed for the selected configuration |
| Equipment Size (W x D x H) | 2991 x 2440 x 2590 mm |
| Total DC Charging Power | 800 kW |
| Fire Protection | Aerosol |
| Battery Chemistry | LiFePO4 |
| DC Charging Voltage | 200-1000 V DC |
| Corrosion Grade | C4 |
| Delivery Time | Confirmed after configuration approval |
| Electrical Cooling | Air cooling |
| Charging Guns | 4 x 200 kW |
| Cell Capacity | 314 Ah |
| Battery Cooling | Liquid cooling |
| Battery Voltage | 728-949 V DC |
| Rated AC Voltage | 230/400 V |
| DC Charging Current | 2-250 A; as specified |
| Battery Energy | 1044 kWh |
| Equipment Weight | 11.2 t approximately |
| Rated AC PCS Power | 500 kW |
| Integrated Equipment | LiFePO4 battery / BMS / PCS / Charger / EMS |
| Brand Name | YINTU |
| Model Number | YT-Mobile ESS-1044kWh-800kW |
View Detail Information
Explore similar products
Temporary Mobile Battery Energy Storage Systems 500 KW 964 KWh Vehicle Mounted
1 MW / 1929 KWh Mobile Battery Energy Storage Systems For Large Site Power And
Trailer Mounted 261 KWh Mobile BESS Liquid Cooled With 160 KW Dual Gun DC
522 kWh LiFePO4 Mobile Battery Storage Systems with 320 kW Dual Gun DC Charging
Product Specification
| Battery Cluster | 2P260S x 2 | Frequency | 50/60 Hz |
| Ingress Protection | IP54 | Packaging Details | Transport protection and trailer/chassis scope agreed for the selected configuration |
| Equipment Size (W x D x H) | 2991 x 2440 x 2590 mm | Total DC Charging Power | 800 kW |
| Fire Protection | Aerosol | Battery Chemistry | LiFePO4 |
| DC Charging Voltage | 200-1000 V DC | Corrosion Grade | C4 |
| Delivery Time | Confirmed after configuration approval | Electrical Cooling | Air cooling |
| Charging Guns | 4 x 200 kW | Cell Capacity | 314 Ah |
| Battery Cooling | Liquid cooling | Battery Voltage | 728-949 V DC |
| Rated AC Voltage | 230/400 V | DC Charging Current | 2-250 A; as specified |
| Battery Energy | 1044 kWh | Equipment Weight | 11.2 t approximately |
| Rated AC PCS Power | 500 kW | Integrated Equipment | LiFePO4 battery / BMS / PCS / Charger / EMS |
| Brand Name | YINTU | Model Number | YT-Mobile ESS-1044kWh-800kW |
| High Light | IP54 1044 kWh Mobile BESS ,1044 KWh Mobile Battery Storage Systems ,Mobile BESS Battery Backup Trailer | ||
MOBILE ENERGY STORAGE | DC CHARGING | AC POWER
Mobile LiFePO4 storage with 1044 kWh energy, 4 x 200 kW DC charging guns and a 500 kW AC PCS. Integrates battery, BMS, PCS, charger and EMS for temporary fleet charging, construction equipment and selected AC backup loads.
Create a deployable charging hub for demanding fleet and construction operations. The 1044 kWh mobile BESS integrates four 200 kW DC charging guns and a 500 kW AC PCS, pairing a 1.044 MWh energy reserve with multiple vehicle connections and higher-power AC supply capability.
YINTU is an energy storage solution provider. We work with capable manufacturing partners to match mobile equipment, charging interfaces and site requirements, and coordinate technical clarification and the agreed project supply scope.
The integrated charger provides 4 x 200 kW rated charging outlets across a stated 200-1000 V DC output range. Select compatible connectors and communication protocols for the intended vehicles. Actual charging power follows vehicle voltage, current limits, battery state and operating conditions.
The integrated PCS provides a 500 kW AC rating at 230/400 V and 50/60 Hz. It supports energy conversion and selected AC supply duties alongside the dedicated DC charging system. AC PCS and DC charging ratings describe separate functions and must not be added together as a guaranteed simultaneous output.
LiFePO4 batteries, BMS, PCS, charger and EMS are combined in one mobile equipment platform. BMS and EMS coordination supports operating supervision while the project design defines energy reserve, load priorities and permitted power allocation.
Liquid cooling manages the battery compartment and air cooling serves the electrical compartment. IP54 protection, C4 corrosion grade and aerosol fire protection provide a defined equipment specification for outdoor site selection and operating planning.
Deploy four 200 kW DC charging outlets at a temporary truck depot or logistics facility. The 1044 kWh battery provides a larger energy reserve for coordinated sessions involving compatible heavy vehicles, with charger allocation and vehicle acceptance limits included in the operating plan.
Bring 1.044 MWh of stored energy close to excavators, bulldozers and loaders. Multiple charging outlets can serve a changing group of compatible machines while the mobile system is placed near the active work front rather than a distant fixed charging station.
Support compatible graders, road rollers and asphalt pavers across project areas. A planned charging window and reserve policy help align energy availability with the work schedule, while transport access and safe placement are assessed before moving the equipment.
Supply charging access for compatible cranes, truck cranes and transport vehicles during site operations. Four outlets give the project team more connection points to schedule, without assuming every vehicle will accept the rated gun power throughout a session.
Use the 500 kW PCS for selected industrial, commercial or temporary-work loads. Grid-connected and islanding specifications support an engineered backup arrangement with load prioritisation, protection and suitable source-transfer equipment.
Establish a mobile charging hub where installed charging capacity is unavailable or insufficient. The platform can be assigned to a particular depot, campaign or project period, with recharge access and the required daily energy throughput planned before deployment.
A compatible grid connection allows the PCS to charge the battery under the approved operating arrangement. Stored DC energy serves the integrated DC charger for compatible vehicles or passes through the PCS to supply selected AC loads. EMS and BMS coordination manages the system within its configured limits.
For a planned AC backup installation, the source selection, STS and protection arrangement coordinates grid supply, any standby source and the PCS. The datasheet specifies a grid-to-off-grid STS switching time below 10 ms; the final project design determines which loads and transfer functions are included.
| Parameter | Specification |
|---|---|
| Battery energy | 1044 kWh |
| Battery chemistry | LiFePO4 |
| Rated cell capacity / energy | 314 Ah / 1004.8 Wh |
| Battery cluster configuration | 2P260S x 2 |
| Battery voltage range | 728-949 V DC |
| Cell cycle life | >=6,000 cycles; test conditions and end-of-life capacity not stated |
| PCS DC operating range | 615-950 V DC |
| Maximum PCS DC current | 808 A |
| Rated PCS AC power | 500 kW |
| Rated AC voltage / frequency | 230/400 V; 50/60 Hz |
| Maximum PCS AC current | 792 A |
| Total rated DC charging power | 800 kW |
| Charging guns / rated power | 4 x 200 kW |
| DC charging output voltage | 200-1000 V DC |
| DC charging output current | 2-250 A; source range retained |
The stated cell cycle life is not a system service-life or warranty guarantee. Charging power varies across the output-voltage range and is limited by the connected vehicle, current rating and operating conditions.
| Parameter | Specification |
|---|---|
| Charging temperature | 0 to +50 C |
| Discharging temperature | -10 to +50 C |
| Battery / electrical compartment cooling | Liquid cooling / air cooling |
| Relative humidity | <=95% RH, non-condensing |
| Operating altitude | <=3,000 m; derating above 3,000 m |
| Ingress protection / corrosion grade | IP54 / C4 |
| Enclosure material | Precision sheet metal |
| Fire protection | Aerosol |
| Equipment weight (approx.) | 11.2 t |
| Equipment dimensions (W x D x H) | 2991 x 2440 x 2590 mm |
Dimensions and weight are equipment values. Trailer or chassis supply, payload, axle loading, road approvals and the final transport arrangement are confirmed for the selected configuration and destination.
| Parameter | Specification |
|---|---|
| Grid-connected allowable voltage | 400 V AC (-20% to +15%) |
| Grid-connected allowable frequency | 50 +/-5 Hz / 60 +/-5 Hz |
| Grid-connected current harmonics (THDI) | <=3% |
| Power factor | -0.99 lagging to 0.99 leading |
| Off-grid rated voltage / frequency | 400 V; 50/60 Hz |
| Off-grid voltage range (source notation) | 400 V AC +10%; negative tolerance not stated |
| Unbalanced-load capability (source notation) | <=100% |
| Off-grid voltage harmonics (THDU) | <=3% with pure resistive load |
| Overload capacity | 110% long-term; 120% for 1 minute |
| Grid-to-off-grid STS switching | <10 ms; transfer and protection scope follow project design |
Share the vehicle types, charging protocol, connector standard, daily energy demand, charging windows and available recharge supply. For AC duties, include load power, starting demand, required operating duration and transfer requirements. YINTU coordinates equipment selection and technical review with the manufacturing partner.
The quotation defines the storage system, charging interfaces, cables, transfer equipment, trailer or chassis, and any commissioning services included. Destination-specific certification, warranty, pricing, delivery and payment terms are confirmed for the selected configuration.
This model has 800 kW total rated DC charging power, provided through 4 x 200 kW charging guns. The AC PCS rating is 500 kW. These ratings are separate and do not establish a combined simultaneous output.
Compatible electric passenger, commercial or construction vehicles may be considered after checking connector type, communication protocol and voltage/current limits. No universal connector standard is specified in this datasheet.
The nominal battery energy is 1044 kWh. Practical charging throughput and AC runtime depend on usable battery limits, reserve, conversion and auxiliary losses, temperature and the actual vehicle or load demand.
The datasheet includes off-grid PCS ratings and STS transfer performance. The supported loads, reserve, earthing, isolation and switching arrangement are established in the project design.
The product image shows a mobile configuration. Equipment dimensions and weight are stated separately; trailer/chassis scope and the final transport configuration are confirmed in the quotation.
Send YINTU your fleet or equipment list, daily energy requirement and deployment plan. We will coordinate a suitable mobile storage configuration, charging interface selection and a clear supply proposal.
Technical source: YT-Mobile ESS-1044kWh-800kW datasheet, V1.0, October 2026. Final specifications and included equipment follow the approved configuration.
Company Details
Business Type:
Distributor/Wholesaler,Exporter,Trading Company
Year Established:
2016
Total Annual:
$ 10 million-$ 20,million
Employee Number:
50~100
Ecer Certification:
Verified Supplier
Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with... Your Partner for Energy Storage Product Sourcing YINTU Energy is the energy storage business of Hunan Yintu New Materials Co., Ltd. Established in 2016, our company has 10-50 employees and an export share of 100%. We connect overseas distributors, installers, EPC companies and project buyers with...
Get in touch with us
Leave a Message, we will call you back quickly!