Products
Manufacturer of a wide range of products which include 100.35kWh 358.4V LiFePO4 High Voltage Battery System With Rack Design,Commercial High Voltage LiFePO4 Battery System Rack Design 200.96kWh 640V,30.72kWh 336V High Voltage Batt...
MOQ: 2 Units
Price: Negotiable
| Rack Architecture | Seven - Module Series Battery Layout |
| Site Deployment Type | Dedicated Indoor Battery Room |
| Module Service Strategy | Module - Level Access and Inspection |
| Project Selection Basis | Daily Energy Demand and Recharge Window |
| Payment Terms | L/C,T/T,Western Union |
| PCS Arrangement | Separate High - Voltage PCS Required |
| Energy Management Role | Solar Energy Shifting and Backup Reserve |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Installation Planning Focus | Rack Load , Access Route and Service Clearance |
| Project Storage Class | 100kWh - Class High - Voltage Battery Bank |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Brand Name | Voltertech |
| Certification | CE , MSDS , UN38.3 |
| Place of Origin | China |
| Model Number | BAT-100KWH-358.4V-RM-Q |
MOQ: 1 Unit
Price: Negotiable
| Battery Bank Architecture | Modular Rack - Based Energy Storage |
| Recommended Deployment | Dedicated Indoor Technical Area |
| Capacity Selection Basis | Daily Energy Use and Backup Requirement |
| System Supply Scope | Battery Bank without PCS or Solar Array |
| Supply Ability | 5000 Units per Month |
| Storage Project Segment | 200kWh Commercial Battery System |
| PCS Arrangement | Separate High-Voltage PCS Required |
| Main Energy Application | Solar Storage and Load Management |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Payment Terms | L/C,T/T,Western Union |
| Backup Planning Level | Commercial and Industrial Energy Reserve |
| Certification | CE , MSDS , UN38.3 |
| Place of Origin | China |
| Brand Name | Voltertech |
| Model Number | BAT-200KWH-640V-RM-Q |
MOQ: 2 Units
Price: Negotiable
| Module Architecture | Six-Stage Series Rack Arrangement |
| Service Access Method | Individual Module Inspection Path |
| System Energy Function | Load Shifting and Backup Reserve |
| Expansion Philosophy | Select Module Count During System Design |
| Energy Storage Tier | 30kWh-Class High-Voltage System |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Payment Terms | L/C,T/T,Western Union |
| Equipment-Room Profile | Medium-Footprint Modular Installation |
| Cabinet Integration | Rack or Battery Cabinet Deployment |
| Project Planning Focus | Daily Energy and Recharge Balance |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Certification | CE , MSDS , UN38.3 |
| Brand Name | Voltertech |
| Model Number | BAT-30KWH-51.2-RM-Q |
| Place of Origin | China |
MOQ: 2 Units
Price: Negotiable
| System Layout | Modular Rack Battery Architecture |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Maintenance Strategy | Module-Level Inspection and Replacement |
| System Energy Role | Solar Energy Shifting and Backup Reserve |
| Deployment Environment | Protected Indoor Energy Room |
| Space Planning Priority | Cabinet Height and Front Service Access |
| Installation Approach | Series-Connected Indoor Battery Stack |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Inverter Requirement | Dedicated High-Voltage Battery Input |
| Payment Terms | L/C,T/T,Western Union |
| Storage Project Tier | Compact High-Voltage Energy Bank |
| Certification | CE , MSDS , UN38.3 |
| Brand Name | Voltertech |
| Place of Origin | China |
| Model Number | BAT-20KWH-51.2V-RM-Q |
MOQ: 2 Units
Price: Negotiable
| Physical Architecture | Eight - Level Rack Battery Stack |
| Maintenance Access | Front - Service Modular Arrangement |
| Structural Planning | Heavy Rack and Floor Load Assessment |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Inverter Topology | High - Voltage PCS or Hybrid Conversion Platform |
| Payment Terms | L/C,T/T,Western Union |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Storage Capacity Segment | 40kWh - Class Modular Energy Bank |
| Solar Shifting with Reserved Backup Energy | Dedicated Indoor Battery Room |
| Project Selection Focus | Capacity - to - Footprint Optimization |
| Supply Ability | 5000 Units per Month |
| Operating Strategy | Solar Shifting with Reserved Backup Energy |
| Certification | CE , MSDS , UN38.3 |
| Brand Name | Voltertech |
| Place of Origin | China |
| Model Number | BAT-40KWH-51.2V-RM-Q |
MOQ: 2 Units
Price: Negotiable
| Communication Architecture | Dual CAN and RS485 Integration Path |
| Payment Terms | L/C,T/T,Western Union |
| Commissioning Record | Module Voltage and Series Polarity Verification |
| Protection Philosophy | Battery-Level and System-Level Protection Layers |
| Supply Ability | 5000 pcs per month |
| Technical Approval Input | PCS Datasheet and Communication Definition |
| PCS Connection Class | High-Voltage DC Energy Storage Input |
| DC Design Priority | Voltage Window and Insulation Coordination |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Current Management | PCS-Controlled Charge and Discharge Limits |
| Local Diagnostic Method | LCD-Assisted Commissioning |
| Model Number | BAT-40KWH-51.2V-RM-Q-2 |
| Brand Name | Voltertech |
| Place of Origin | China |
| Certification | CE , MSDS , UN38.3 |
MOQ: 2 Units
Price: Negotiable
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Modular Structure | Ten - Level Series Battery Architecture |
| Installation Sequence | Staged Module Placement and Series Assembly |
| Supply Ability | 5000 Units per Month |
| Structural Design Focus | Rack Stability and Floor Load Distribution |
| Service Concept | Accessible Module - Level Inspection |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Project Capacity Level | 50kWh - Class High - Voltage Storage Bank |
| Equipment-Room Requirement | Dedicated Controlled Battery Area |
| Site Planning Priority | Delivery Route and Heavy Rack Installation |
| Payment Terms | L/C,T/T,Western Union |
| Energy Management Role | Larger Solar Shifting and Backup Reserve |
| Brand Name | Voltertech |
| Place of Origin | China |
| Model Number | BAT-51KWH-51.2V-RM-Q |
| Certification | CE , MSDS , UN38.3 |
MOQ: 1 Set
Price: Negotiable
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Protection Philosophy | Battery BMS plus External HV Isolation |
| Commissioning Priority | Module Voltage , Polarity and Stack Validation |
| Communication Path | Optional CAN or RS485 Data Link |
| Integration Objective | PCS Voltage and Battery-Control Coordination |
| Payment Terms | L/C,T/T,Western Union |
| Local Monitoring Option | Optional LCD Status Interface |
| Technical Approval Input | PCS Model , Firmware and Protocol Details |
| Supply Ability | 5000 Units per Month |
| System Boundary | Battery Bank Only ; PCS and Switchgear Separate |
| Control Relationship | PCS - Managed Charge and Discharge Operation |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Certification | MSDS |
| Model Number | BAT-100KWH-358.4V-RM-Q-2 |
| Brand Name | Voltertech |
| Place of Origin | China |
MOQ: 2 Units
Price: Negotiable
| Electrical Design Style | Moderate-Current High-Voltage DC Platform |
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Buyer Preparation | Submit PCS Brand, Model and Firmware |
| Integration Target | High - Voltage Hybrid Inverter or PCS |
| Payment Terms | L/C,T/T,Western Union |
| Monitoring Method | Local LCD with System-Level Data Link |
| Commissioning Sequence | Voltage / Polarity / Protocol / Alarm Check |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Managed through Compatible PCS Settings | Battery BMS plus External DC Protection |
| Communication Planning | CAN / RS485 Protocol Review |
| Charging Control | Managed through Compatible PCS Settings |
| Model Number | BAT-20KWH-51.2V-RM-Q-2 |
| Brand Name | Voltertech |
| Certification | CE , MSDS , UN38.3 |
| Place of Origin | China |
MOQ: 2 Units
Price: Negotiable
| Delivery Time | 10-15 Days for Samples; 30-40 Days for Bulk Production |
| Electrical Safety Focus | High - Voltage Isolation and Controlled Access |
| Communication Requirement | Verified CAN or RS485 Protocol |
| Local Monitoring Role | LCD for Battery - Side Status Checks |
| System Control Relationship | PCS - Directed Energy Conversion |
| Payment Terms | L/C,T/T,Western Union |
| Protection Coordination | BMS with External System Disconnects |
| Commissioning Method | Ten - Module Voltage and Polarity Record |
| Supply Ability | 5000 pcs per month |
| Technical Approval Package | PCS Model , Firmware , Wiring and Protocol |
| PCS Integration Level | Upper - Voltage Modular Battery Platform |
| Packaging Details | Heavy-Duty Wooden Case with Protective Foam |
| Certification | CE , MSDS , UN38.3 |
| Place of Origin | China |
| Model Number | BAT-51KWH-51.2V-RM-Q-2 |
| Brand Name | Voltertech |
Explore more categories
Get in touch with us
Leave a Message, we will call you back quickly!